My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f, <br /> k . -0 RTEL <br /> 4'_ `ARCHITECTS <br /> CITY OF WOODBURY, MN . <br /> PUBLIC WORKS FACILITY n. ? <br /> ADDITION AND EXPANSION �� -. ' <br /> Contact:Klayton Eckles, ,;,, �Jt <br /> Public Works Directorp:(763)714-3720 t 'ate'. "' <br /> Y <br /> e:keckles @ci.woodbury.mn.us f t, f .. <br /> , <br /> The city of Woodbury's project was '� <br /> unique in that the original building r/M___ I <br /> ate Art 10101. G <br /> was designed and constructed in . 1 i � ill <br /> 1996. That master plan included as = <br /> many as three separate additions to 4 11` - <br /> the main facility,as well as a separate <br /> renovation of the previous 1970's <br /> facility for the city's parks department <br /> and salt storage. <br /> ,,.r <br /> The key in long term planning for <br /> facility expansions is to site the <br /> building correctly in the initial phase, ;T.4 _. i <br /> plan for economical expansions by �" <br /> building a structure that can be easily <br /> modified,and knowing the ultimate ----``��__ <br /> size of facility based on community <br /> ---._ a' oliii. 4441/ <br /> growth. <br /> C ----.-- &'---------) <br /> Figure 1-This 3D aerial site plan <br /> shows the full building after the 2003 - --.„:------------_, <br /> phase 2 expansion. The third phase <br /> expansion is slated for 2015-2016 <br /> provided funding is available at that <br /> time. The city of Woodbury has grown <br /> at a rate that exceeded even the 20 <br /> year projections made in the initial ==' ' <br /> project. <br /> j I <br /> Figure 2-This building plan shows the 2001„11.11 <br /> \10[4,1 <br /> planned expansions to the facility in 11'"•"ri <br /> addition to the original 1996 "`"'`"1996naA I <br /> WIJMS IllittiNI: 2013-2014 N <br /> construction. ttrmtw IN 1 <br /> _2601 <br /> 2001 11It1 . <br /> �1M1.1 I1PNY. <br /> I G. <br /> ‘'NL.... <br /> hyi <br /> 135 River <br />
The URL can be used to link to this page
Your browser does not support the video tag.