Laserfiche WebLink
k / <br /> c <br /> p� <br /> t . 1 I <br /> Yi e t: TEL <br /> E L <br /> ARCH ITECTS <br /> CITY OF INVER GROVE <br /> HEIGHTS likifr, a GERTEL <br /> ��� ANCH FCIS <br /> i <br /> PUBLIC WORKS DEPARTMENT _ ----_. <br /> .�;acN.a _ <br /> MASTER PLAN/STUDY ^` t '"" <br /> INVER GROVE HEIGHTS, MN .. � ""..., / <br /> ..' IMO Damen 0... <br /> — <br /> Contact: Scott Thureen _ __ <br /> Public Works Director <br /> _: <br /> City of Inver Grove Heights \./\ <br /> 8150 Barbara Avenue - <br /> Inver Grove Heights,MN 55077 ' vi:%p: 651-450-2571 „ I — — — - ..... <br /> e: sthureen @invergroveheights.org 3 n�u <br /> � a <br /> I I"- <br /> .'--1-7 ..q j , <br /> _ ... ' <br /> Project currently under review by City, .x � <br /> with multiple options presented. "' M"" <br /> This study for Inver Grove Heights <br /> i .w... 'Pun .. - =PLAN <br /> involved master planning for facilities ssK ~.n S-3 <br /> at the main campus. The site has <br /> limited space available for expansion. <br /> Included in this study was an <br /> Inver Grave Heights Moinlenoncr Futility Ewluntions 8 Recunm■eeduumn Report <br /> evaluation of the existing operations, PHASE 1:South storage/maintenance addition <br /> Division item Subtotal Total a summitry wrrwnmgrrnmmcwannns <br /> space programming,evaluation of the <br /> n,aNmnenmrmm rrmmm,ry4 .,m ISotmenelation ml.+Meeks..outlined" <br /> 01 General 0ondkIOls $550,000.00 the a v,s Mr"Rrapin T"`"a'ns..^.the renew wrar.mmye of the ere,The optInon weal <br /> existing facilities,site planning,design "- ad nnm"""sOni on`«P"^•nr"'"a^"r^•R^ma.a^m•m^-nosh..^ <br /> GS,Permltz,0&P See above Wan lba.edon meal ah:e arra all....gains W Golding parameter* <br /> and cost estimating. 02 Sltmeork $392,00000 <br /> - --- ------- <br /> Earthwork $40,000.00 3.O■aso,.l. eon su,r ''00050.1-1 <br /> Utilities $45,000.00 <br /> Several planning options for the city 0SQ.Fr 1.303 SC I5 Lem SQaT. <br /> p g p Y Paving,patching,milling $95,00000 <br /> were prepared including expansion of Site concrete 530,000.00 0SQFT "505.3' ',00"5°FT. <br /> the existing main facility/site and Fencing/retaining wall 161,00000 °SQm 1,0110 SQ r' enOiQFT <br /> Landscape,etc. $35,000.00 mesa,R, 1300 sq T- 3)oos°rT. <br /> facility renovations. In all,seven Demo $85,000.03 12s,aarareamasl <br /> options were prepared,from which it 03 Concrete $945,009.00 aS.ame°rn 07,659 Se lT 65900S0,rr. <br /> leamivresneed for <br /> is expected that the City Board and F Hogs,aprons,te se $85,000.00 ad MOO MST <br /> 0m=a ''""Towel <br /> Floors,7" $380,000.00 <br /> Staff will select the best option that 0S°m 702"5°` 0,0113 OJT <br /> Doors, $5,000.00 Inane., <br /> wnkk awrglG) <br /> meets their needs,goals and budget. Prr'°rt well panels 5470,000.00 6da'Sart. 0,330 sar. apW SQFL <br /> Plank doers $5,000.00 <br /> out Fr ,,,anncnrr. rs_;esso.nr. <br /> 04 Masonry $04A00.00 <br /> As with many of the Master Plan/ CMl3 walls 585.00000 1070 s0n. 1,00 t5F 1,000517,,= <br /> Studies which we complete,phasing OS Steal $460.000.00 eysnsQrc 11.371 S°" USO, <br /> 300 (Marcel la healed <br /> has been taken into consideration. °'mmnr,beams,;°'=tt $4lo, l FT <br /> Mist metals 560,000.00 S,4a850�n. 10,9ai to-*. Sect sheer <br /> Phasing on a large scale project such 06 wood and plastics $40,000.00 MIN MLA OFAIL ,79015°.'7. 110,970 SQ.FT. 307579 SQ.FT. <br /> as this allows for the cost to be spread "ugh carpentry $30•°00.00 <br /> Finish carpentry $10,000.00 aerie,ArrAUata Lid LNutte14 <br /> out over multiple years(if this is a <br /> concern),and also can allow for <br /> facility to be fully operational during <br /> the actual facility construction period. <br /> t---------- <br /> II, <br /> 6d. <br /> El <br /> 133 River <br />