|
k /
<br /> c
<br /> p�
<br /> t . 1 I
<br /> Yi e t: TEL
<br /> E L
<br /> ARCH ITECTS
<br /> CITY OF INVER GROVE
<br /> HEIGHTS likifr, a GERTEL
<br /> ��� ANCH FCIS
<br /> i
<br /> PUBLIC WORKS DEPARTMENT _ ----_.
<br /> .�;acN.a _
<br /> MASTER PLAN/STUDY ^` t '""
<br /> INVER GROVE HEIGHTS, MN .. � ""..., /
<br /> ..' IMO Damen 0...
<br /> —
<br /> Contact: Scott Thureen _ __
<br /> Public Works Director
<br /> _:
<br /> City of Inver Grove Heights \./\
<br /> 8150 Barbara Avenue -
<br /> Inver Grove Heights,MN 55077 ' vi:%p: 651-450-2571 „ I — — — - .....
<br /> e: sthureen @invergroveheights.org 3 n�u
<br /> � a
<br /> I I"-
<br /> .'--1-7 ..q j ,
<br /> _ ... '
<br /> Project currently under review by City, .x �
<br /> with multiple options presented. "' M""
<br /> This study for Inver Grove Heights
<br /> i .w... 'Pun .. - =PLAN
<br /> involved master planning for facilities ssK ~.n S-3
<br /> at the main campus. The site has
<br /> limited space available for expansion.
<br /> Included in this study was an
<br /> Inver Grave Heights Moinlenoncr Futility Ewluntions 8 Recunm■eeduumn Report
<br /> evaluation of the existing operations, PHASE 1:South storage/maintenance addition
<br /> Division item Subtotal Total a summitry wrrwnmgrrnmmcwannns
<br /> space programming,evaluation of the
<br /> n,aNmnenmrmm rrmmm,ry4 .,m ISotmenelation ml.+Meeks..outlined"
<br /> 01 General 0ondkIOls $550,000.00 the a v,s Mr"Rrapin T"`"a'ns..^.the renew wrar.mmye of the ere,The optInon weal
<br /> existing facilities,site planning,design "- ad nnm"""sOni on`«P"^•nr"'"a^"r^•R^ma.a^m•m^-nosh..^
<br /> GS,Permltz,0&P See above Wan lba.edon meal ah:e arra all....gains W Golding parameter*
<br /> and cost estimating. 02 Sltmeork $392,00000
<br /> - --- -------
<br /> Earthwork $40,000.00 3.O■aso,.l. eon su,r ''00050.1-1
<br /> Utilities $45,000.00
<br /> Several planning options for the city 0SQ.Fr 1.303 SC I5 Lem SQaT.
<br /> p g p Y Paving,patching,milling $95,00000
<br /> were prepared including expansion of Site concrete 530,000.00 0SQFT "505.3' ',00"5°FT.
<br /> the existing main facility/site and Fencing/retaining wall 161,00000 °SQm 1,0110 SQ r' enOiQFT
<br /> Landscape,etc. $35,000.00 mesa,R, 1300 sq T- 3)oos°rT.
<br /> facility renovations. In all,seven Demo $85,000.03 12s,aarareamasl
<br /> options were prepared,from which it 03 Concrete $945,009.00 aS.ame°rn 07,659 Se lT 65900S0,rr.
<br /> leamivresneed for
<br /> is expected that the City Board and F Hogs,aprons,te se $85,000.00 ad MOO MST
<br /> 0m=a ''""Towel
<br /> Floors,7" $380,000.00
<br /> Staff will select the best option that 0S°m 702"5°` 0,0113 OJT
<br /> Doors, $5,000.00 Inane.,
<br /> wnkk awrglG)
<br /> meets their needs,goals and budget. Prr'°rt well panels 5470,000.00 6da'Sart. 0,330 sar. apW SQFL
<br /> Plank doers $5,000.00
<br /> out Fr ,,,anncnrr. rs_;esso.nr.
<br /> 04 Masonry $04A00.00
<br /> As with many of the Master Plan/ CMl3 walls 585.00000 1070 s0n. 1,00 t5F 1,000517,,=
<br /> Studies which we complete,phasing OS Steal $460.000.00 eysnsQrc 11.371 S°" USO,
<br /> 300 (Marcel la healed
<br /> has been taken into consideration. °'mmnr,beams,;°'=tt $4lo, l FT
<br /> Mist metals 560,000.00 S,4a850�n. 10,9ai to-*. Sect sheer
<br /> Phasing on a large scale project such 06 wood and plastics $40,000.00 MIN MLA OFAIL ,79015°.'7. 110,970 SQ.FT. 307579 SQ.FT.
<br /> as this allows for the cost to be spread "ugh carpentry $30•°00.00
<br /> Finish carpentry $10,000.00 aerie,ArrAUata Lid LNutte14
<br /> out over multiple years(if this is a
<br /> concern),and also can allow for
<br /> facility to be fully operational during
<br /> the actual facility construction period.
<br /> t----------
<br /> II,
<br /> 6d.
<br /> El
<br /> 133 River
<br />
|