P',OJECT TEAM
<br /> T e proposed team has a long and successful history of working together on past municipal projects,and are committed to work on Elk River's project.
<br /> K:n Stone,AIA,LEED AP BD+C,CID Mr.Stone will be your day-to-day contact and Relevant Experience
<br /> Role:Project Architect responsible for cost estimating,he provides detailed • Minneapolis Fire Station#6
<br /> A. ` estimates based on industry cost standards,as well as
<br /> Experience:27 Years Y • Burnsville Fire Station#1,Pre-design
<br /> ;' Registration:Architect contractor and vendor costs.Mr.Stone has the • Medina Facilities Master Plan:City Hall,
<br /> 'ff capability to provide a project budget that tracks
<br /> (MN#17541),CID,Interior Public Works,Fire and Police
<br /> Designer,LEED AP BD+C other costs beyond construction costs to provide • St.Croix Lutheran High School,Master Plan
<br /> clients with a total budget picture.He understands Regional Training Site Maintenance Facility,
<br /> •how to coordinate multiple issues in the building's
<br /> Camp Ripley
<br /> design to meet facility needs.His expertise includes
<br /> technical knowledge of current building systems. • GSA,US Marshals Firing Range
<br /> • Mn/DOT Maple Grove Maintenance Facility
<br /> Mendi Tauferner,AIA,LEED AP BD+C Mandi has experience in proposals,schematic design, • MnDOT Maple Grove Facility
<br /> Role:Cost Estimating construction documents,collaboration with consultants, • MnDOT Transfer Road
<br /> Experience: 10 Years and construction administration is the breadth of • MnDOT Nicollet Garage
<br /> 3
<br /> .,, contributions Mandi brings to the Kodet design team. • Crystal Maintenance Facility
<br /> (,` 0 6 Specific experience in the bidding phase,cost estimating, • Bloomington Public Works Facility,
<br /> a,0 project coordination,and office management extend Addition and Remodel,Office Remodel
<br /> %` her collective knowledge of the construction process. • GSA Duluth Coast Guard Renovation
<br /> Teri Nagel,CSI,LEED AP BD+C Ms.Nagel brings architectural experience in space • Mn/DOT Cedar Avenue Maintenance
<br /> Role:Programming/ programming and long-range planning for mainte- • Mn/DOT Maple Grove Maintenance Facility
<br /> Na, Building Assessment/Code Hance buildings.She will work closely with Henne • City of Medina Public Works Master Plan
<br /> ` Specialist pin County to do the building assessment and pro • Bloomington Public Works Facility,
<br /> gramming in order to determine their needs,verify Addition and Remodel,Office Remodel
<br /> Experience:22 Years current uses,and develop projections based on the
<br /> ,., • Coon Rapids Public Works Facility Eden
<br /> Reg.:CSI,LEED AP BD+C,US client's input and ideas. Ms.Nagel is an expert on
<br /> Green Bldg.Council building code requirements and standards and is Prairie Maintenance Facility
<br /> particularly knowledgable on accessibility issues, ▪ Lakeville Central Maintenance Facility
<br /> and the Americans with Disabilities Act(ADA).
<br /> Adrian Chan,Associate AIA With 8 years of experience,Adrian,plays an integral • MnDOT Maple Grove Facility
<br /> Role:Programming& role at Kodet.He is instrumental in communicating and • MnDOTTransfer Road
<br /> Stakeholder Engagement producing accurate and clear design documents and • MnDOT Nicollet Garage
<br /> IA Experience: 8 Years ensures that excellent design is carried through the • Crystal Maintenance Facility
<br /> entire project.As a project designer,Adrian works • Twin Cities Chinese Christian Church
<br /> closely with office team members and clients to bring • MSAD Frechette Hall
<br /> about quality design and service to meet projects • Yinghua Academy
<br /> ,,, objectives.
<br /> Edward J.Kodet,Jr. Mr.Kodet has practiced architecture for over forty • Minneapolis Fire Station#6
<br /> Role:Principal-in-charge years.By combining the knowledge and skills of • Burnsville Fire Station#1,Pre-design
<br /> ilt FAIR,CID,LEED AP BD+C academic and professional careers,he is a leader in • Fire s Feasibility Study
<br /> Experience:40 Years the architectural profession.His strong commitment • Eden Bloomington Prairie Fire Stations Station-Satellite Station
<br /> to and success in architectural design is evident in • Byron Fire Station
<br /> + Registration Architect
<br /> the firm's many award-winning commissions and • Regional Training Site Maintenance Facility,
<br /> ' (MN#10266) published works,both domestic and international. Camp Ripley
<br /> Mr.Kodet believes in a consensus-building,practical • GSA,US Marshals Firing Range
<br /> approach of working with architectural ideas and • Bloomington Public Works Facility&Storage
<br /> teaming with clients. Garage
<br /> 6 Kodet Architectural Group, Ltd.
<br /> 77 KC)I;f
<br />
|