Laserfiche WebLink
OERTEL FEE e SCOpE- <br /> ARCHITECTS <br /> PLANNING AND SCHEMATIC DESIGN, PART 2 FEE: $5,500.00 <br /> Tasks: <br /> • Development of preferred plan <br /> • Preparation of cost estimates with all project costs <br /> • Review meeting to discuss updated plans <br /> Deliverables: Updated plans of preferred option(s) and cost estimates <br /> CONCLUDING ITEMS FEE: $3,500.00 <br /> Tasks: <br /> • Updates to plans, finalize report, and related tasks <br /> • Assemble package of information <br /> • Meeting with commissioners <br /> Deliverable: Final documents <br /> 3-D MODEL OF PREFERRED OPTION FEE: $7,500.00 <br /> Task: <br /> • Prepare a 3-D rendering of the preferred option showing phasing <br /> TOTAL FEE: $37,600.00 <br /> Items not included in our fee include, although we can hire this work out on request: <br /> • Hazardous materials evaluation and testing <br /> • Soil borings <br /> • Site surveys, utility and grading information <br /> I <br /> c <br /> Rl <br /> 29 River <br />