My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OERTEL FEE e SCOpE- <br /> ARCHITECTS <br /> PLANNING AND SCHEMATIC DESIGN, PART 2 FEE: $5,500.00 <br /> Tasks: <br /> • Development of preferred plan <br /> • Preparation of cost estimates with all project costs <br /> • Review meeting to discuss updated plans <br /> Deliverables: Updated plans of preferred option(s) and cost estimates <br /> CONCLUDING ITEMS FEE: $3,500.00 <br /> Tasks: <br /> • Updates to plans, finalize report, and related tasks <br /> • Assemble package of information <br /> • Meeting with commissioners <br /> Deliverable: Final documents <br /> 3-D MODEL OF PREFERRED OPTION FEE: $7,500.00 <br /> Task: <br /> • Prepare a 3-D rendering of the preferred option showing phasing <br /> TOTAL FEE: $37,600.00 <br /> Items not included in our fee include, although we can hire this work out on request: <br /> • Hazardous materials evaluation and testing <br /> • Soil borings <br /> • Site surveys, utility and grading information <br /> I <br /> c <br /> Rl <br /> 29 River <br />
The URL can be used to link to this page
Your browser does not support the video tag.