Laserfiche WebLink
PROJECT EXPERIENCE <br /> BLOOMINGTON STORAGE GARAGE <br /> DESIGN/CONSTRUCTION <br /> B oomington, MN <br /> -ti',t i. %,_.1e 1/.. '4) 1 , e i ', <br /> • <br /> IV <br /> "rh ,10, - '1f <br /> \I .`f"' .A \ c\-. I { ,_ <br /> i':dr if <br /> Ilk r j <br /> — — <br /> • <br /> Pre-design Plan <br /> BLOOMINGTON <br /> STORAGE GARAGE <br /> I ...1/ .. <br /> 1 1111 r '7, <br /> ----'....moramomm....ei <br /> PROJECT SUMMARY PROJECT DESCRIPTION <br /> lient:City of Bloomington,MN <br /> ize:55,963 s.f Bloomington Storage Garage houses major The fire and police storage provides space for <br /> ost:$4,122,427 city functions such as a wash bay,fire and large tactical equipment.Additionally,it is a <br /> ar:2006 police storage,SWAT team and Mall of high security space providing storage space <br /> America police support gear,public works for new federally funded equipment,tactical <br /> REFERENCE warehouse,and vehicle storage. gear,emergency equipment and support <br /> equipment as the department determines.It <br /> lay of Bloomington <br /> The wash bay is designed to provide vehicle is designed for quick response and provides <br /> J m Eiler,Assistant Maintenance washing for multiple vehicle sizes and has space for bomb response gear and other high <br /> uperintendent catwalks on each side for use with a wand for end security demands. <br /> •52-563-8766 washing high areas of equipment as well as <br /> fully cleaning of the underside of equipment. <br /> CITY OF ELK RIVER MUNICIPAL UTILITIES 25 <br /> 96 <br />