My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT EXPERIENCE <br /> CRYSTAL PUBLIC WORKS FACILITIES MASTER <br /> PLAN STUDY <br /> ASTER PLAN <br /> •rystal, MN <br /> 1 2 3 a 5 OPTION 2: EXPANSION OF EXISTING <br /> r_--•—•— V-r•:-,:.Vx--rr• 117.•-:.,; :•sY-S-*: N ••.,, SCHEME 2 FACILITIES <br /> f; <br /> I .rF 1 t <br /> 1 <br /> I <br /> E <br /> _. .J t <br /> I ...,..,... <br /> j:• COMPARISON OF SITE <br /> MAIM &BUILDING SIZES <br /> I J Tn <br /> b O <br /> _ :17-1.,..41,:::: P <br /> OS&CONS <br /> �. _ t _ <br /> OUTLINED <br /> 0.1.6117. <br /> �_.. . .r .. SCHEME 8 <br /> . i <br /> i ..w.,... •• <br /> ill —,.y.«. • 1 ,..11.1,1.11; 13 �'� � '=-,\ <br /> x - —'° PROS&CONS <br /> ;_ <br /> i OUTLINED <br /> OPTION 8: NEW FACILITY ON SITE a...... .....""""" "°° <br /> ROJECT SUMMARY 1 i <br /> PROJECT DESCRIPTION <br /> aster Plan&New Construction <br /> ze:69,541 sF Kodet Architectural Group provided multiple <br /> ost:Est.$8.4M design options for the city to compare costs, <br /> ompleted:Estimated 2015 size,operations,and efficiencies for their public <br /> works campus.The two options on this page <br /> •EFERENCE show expansion of their existing facilities(top), <br /> •m Mathisen,Public Works Director/City and a new building on a generic site(bottom). <br /> :ngineer Each scheme included a list of"pros"and"cons; <br /> •141 Douglas Drive North Crystal,MN 55422 as well as a comparison of site and building <br /> 63.531.1 160 size. Cost estimates were provided with each <br /> scheme,including site acquisition costs and soft <br /> costs. Kodet worked closely with City staff in <br /> developing the options that were presented in <br /> City Council work sessions. <br /> 8 Kodet Architectural Group,Ltd. <br /> 89 KODET 11 �— <br />
The URL can be used to link to this page
Your browser does not support the video tag.