My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. HRSR 09-07-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2000-2009
>
2004
>
09-07-2004
>
5.1. HRSR 09-07-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 3:36:22 PM
Creation date
6/11/2015 3:25:54 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
9/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• of energy transmission in an exterior building envelope—walls,roofs, doors and <br /> windows, etc.) and energy usage by lighting and mechanical systems. A <br /> deficiency in the energy code(inadequate insulation,non-insulated window <br /> systems, improper air infiltration protection, etc.)reduces energy efficient <br /> operation and adversely affects building system durability;therefore, a deficiency <br /> in the energy code is considered to contribute to a condition requiring substantial <br /> renovation or clearance. <br /> Office evaluations—Following the on-site evaluation, each building was then <br /> reviewed,based on on-site data, age of construction, building usage and <br /> occupancy, square footage, and known improvements(from building permit data), <br /> and an assessment was made regarding compliance with current mechanical, <br /> electrical, and energy codes. A basic code review was also completed regarding <br /> the potential need for additional egress(basement stairways, for example), <br /> sprinkler systems, or elevators. <br /> Deficiency Cost—Costs to correct identified deficiencies were determined by <br /> using R. S. Means Cost Data and our professional judgement and experience. In <br /> general,where several items of varying quality were available for selection to <br /> correct a deficiency, an item of average cost was used, as appropriate for typical <br /> commercial or residential applications. Actual construction costs are affected by <br /> many factors(bidding climate, size of project, etc.). Due to the nature of this <br /> assessment,we were only able to generalize the scope of work for each <br /> • correction; that is to say that detailed plans, quantities, and qualities of materials <br /> were not possible to be known. Our approach to this matter was to determine a <br /> preliminary cost projection suitable to the level of detail that is known. This <br /> process was similar to our typical approach for a cost projection that may be given <br /> to an owner during a schematic design stage of a project. <br /> Costs to correct deficiencies were computed for each building and compared to <br /> the building replacement cost to determine if the 15%requirement was met. <br /> The total number of buildings determined to be"structurally substandard"by satisfying <br /> both the Conditions Test and the Code Test in this manner was compared to the total <br /> number of buildings in the district to determine if the 50%requirement was met. <br /> Reports on Structurally Substandard Buildings and Individual Building Summary Reports <br /> are available for review at the offices of SEH, City of Elk River, and Briggs&Morgan, <br /> St. Paul, Minnesota. <br /> Technical Conditions Resources—the following list represents the current building codes <br /> applicable to new buildings used in the Building Deficiency review. <br /> 1998 Minnesota State Building Code <br /> 1997 Uniform Building Code <br /> 1997 Uniform Housing Code <br /> MN 1341 —Minnesota Accessibility Code, Chapter 1341 (1999) <br /> • <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.