Laserfiche WebLink
PAY ESTIMATE #3 <br />CITY OF ELK RIVER <br />Natures Edge Business Center - Phase 2 Improvements <br />Honorable Mayor & City Council <br />City of Elk River <br />Elk River, MN 55330 <br />RE: Natures Edge Business Center - Phase 2 Improvements <br />Contractor: LaTour Construction, Inc. <br />Contract Amount: $1,311,227.89 <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above-referenced project by LaTour Construction, Inc. <br />ITEM <br />NO.ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITYUNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE EXTENSION <br />1CLEARING 2.30ACRE$4,100.009,430.00$ 2.4610,086.00$ <br />2GRUBBING 2.30ACRE$4,100.009,430.00$ 2.4610,086.00$ <br />3REMOVE PIPE CULVERTS26LIN FT$7.00182.00$ 26182.00$ <br />4REMOVE BITUMINOUS PAVEMENT 811SQ YD$2.802,270.80$ 8112,270.80$ <br />5SALVAGE RANDOM RIPRAP20CU YD$9.00180.00$ 20180.00$ <br />6COMMON EXCAVATION (EV) (P)152,868CU YD$1.88287,391.84$ 152,868287,391.84$ <br />7AGGREGATE BASE CLASS 5 - TRAIL (CV) (P) 325CU YD$27.008,775.00$ -$ <br />8AGGREGATE BASE CLASS 5 - STREET (CV) (P) 2,705CU YD$21.8058,969.00$ 2,70558,969.00$ <br />9BITUMINOUS MATERIAL FOR TACK COAT433GALLONS$3.201,385.60$ 120384.00$ <br />10TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 2.5" THICK1,674SQ YD$10.4017,409.60$ -$ <br />11TYPE SP 12.5 WEARING COURSE MIXTURE (3,B) 2.0" THICK8,650SQ YD$7.9068,335.00$ -$ <br />12TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 2.5" THICK8,650SQ YD$9.4081,310.00$ 8,65081,310.00$ <br />134" POLYSTYRENE INSULATION30SY$46.501,395.00$ 14.22661.23$ <br />146" CONCRETE WALK949SQ FT$5.355,077.15$ 50267.50$ <br />15CONCRETE CURB & GUTTER DESIGN B6183,737LIN FT$10.5039,238.50$ 3,73739,238.50$ <br />16TRUNCATED DOMES64SQ FT$31.001,984.00$ -$ <br />17TYPE III BARRICADES7EACH$245.001,715.00$ -$ <br />18FURNISH SIGN PANELS TYPE C23SQ FT$39.00897.00$ -$ <br />19SILT FENCE, TYPE MS6,708LIN FT$1.8512,409.80$ 6,52412,069.40$ <br />20STORM DRAIN INLET PROTECTION9EACH$240.002,160.00$ 92,160.00$ <br />21STABILIZED CONSTRUCTION EXIT1LUMP SUM$990.00990.00$ 1990.00$ <br />22EROSION CONTROL SUPERVISOR1LUMP SUM$3,250.003,250.00$ 0.752,437.50$ <br />23SEEDING 39ACRE$97.003,783.00$ 31.173,023.49$ <br />24SEED MIXTURE 25-1212379POUND$4.5510,824.45$ 1,8368,353.80$ <br />25MULCH MATERIAL TYPE 178TON$235.0018,330.00$ 42.09,870.00$ <br />26EROSION CONTROL BLANKETS CATEGORY 320,640SQ YD$1.1523,736.00$ 18,25020,987.50$ <br />27FERTILIZER TYPE 111700POUND$0.455,265.00$ 7,6773,454.65$ <br />28EROSION CONTROL1LUMP SUM$3,500.003,500.00$ 0.752,625.00$ <br />29PAVEMENT MESSAGE (LT ARROW) EPOXY2EACH$153.00306.00$ -$ <br />30PAVEMENT MESSAGE (RT ARROW) EPOXY2EACH$153.00306.00$ -$ <br />314" SOLID LINE WHITE - EPOXY550LIN FT$0.80440.00$ -$ <br />324" DOUBLE SOLID LINE YELLOW - EPOXY1,456LIN FT$1.001,456.00$ -$ <br />33CROSSWALK MARKING - EPOXY162SQ FT$8.201,328.40$ -$ <br />683,460.14$ 556,998.21$ Total Bid Schedule "A" <br />June 3, 2015 <br />13065 Orono Parkway <br />Award Date: September 18, 2014 <br />Completion Date: July 15, 2015 <br />Bid Schedule "A" - Street Construction <br />S:\Municipal\Aelkriver\ER302\Pay Estimates\ER302 PE.xlsx PE - 1