Laserfiche WebLink
r • <br /> VEIT ENVIRONMENTAL, INC. <br /> PROPOSAL AND AGREEMENT <br /> PROPOSAL SUBMITTED TO: Mr.Terry Maurer <br /> Howard R.Green Company <br /> 1326 Energy Park Drive <br /> St.Paul,MN 55108 <br /> RE: Abestos Budget and Demolition Budget <br /> Elk River Municipalities Building <br /> 322 King Avenue <br /> Elk River,MN <br /> We hereby submit this BUDGETARY estimate proposal for the work described below: <br /> Asbestos Building Survey $1,000.00 <br /> Asbestos surveys range in costs from approx.$750 for small residential houses to several thousand dollars for <br /> larger industrial or commercial type buildings.This estimate should cover most of the costs for a building survey <br /> which would include asbestos survey and hazardous waste survey information.Lead Paint survey may cost an <br /> additional$300-$500 dollars if performed at the same time as the others. <br /> • Asbestos Abatement $13,000.00—$28,000.00 <br /> Our proposal fluctuation is based upon the ceiling tile becoming positive for asbestos containing material.This <br /> low range of estimate is includes the building linoleum flooring and the black tar paper in the lower level <br /> mechanical room to assume to contain asbestos.In the upper range of estimate we also have included some pipe <br /> insulation that may be hidden within the existing walls that may service the restrooms on the upper floors. <br /> Demolition $26,000.00—30,000.00 <br /> Our proposal includes all mobilization of necessary demolition equipment,a demolition permit,adequate <br /> supervision,complete building demolition including footing and slab removal,debris disposal,backfill of the site, <br /> and utility disconnects. (Excludes tank removal,well abandonment,testing,regulated waste removal,and removal <br /> of personal property).Upper estimate would include standard hazardous waste materials to be removed such as <br /> fluorescent bulbs,PCB ballasts,mercury switches,door closures,and exit lamps,etc.—No chemical wastes. <br /> All work to be done in compliance with State and Federal rules and regulations. <br /> Work To Include: <br /> • All Labor,Materials,Equipment,Insurance,and Disposal. <br /> Work To Exclude: <br /> • Hazardous waste disposal other than asbestos. <br /> Signature: Date: 12/3/03 <br /> Scott Lodico <br /> • Title: Project Manager/Estimator <br />