My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1C. SR 06-01-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
06-01-2015
>
6.1C. SR 06-01-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 12:59:23 PM
Creation date
5/28/2015 4:45:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background /Discussion <br />On March 16, 2014, the Elk River Economic Development Authority and the City Council approved a <br />purchase agreement, contingent upon approval of the CUP and rezoning applications. <br />Staff met with the applicant and their team on March 24, 2015 and discussed several aspects of the <br />project listed below: <br />• Staff indicated that the property is currently zoned Business Park (BP) and that would be the <br />baseline for the PUD and CUP requirements. <br />• Staff expressed concern with the proposed front yard setback of 10 feet. The BP district requires <br />25' front yard setbacks for parking adjacent to Twin Lakes Road, a major north south corridor <br />through the community. <br />• Staff informed the applicant the ordinance requirements for landscaped islands and that all <br />parking areas shall be bound with concrete curbing. <br />• Screening of utility equipment was discussed <br />• Staff discussed driveway width requirements and discussion followed regarding vacating 170th <br />Circle. Staff directed the applicant to apply for a street vacation if they felt that was the best <br />solution. <br />Analysis <br />Comprehensive Plan <br />The Comprehensive Plan, approved by the City Council in May of 2014, guides the property with an <br />underlying land use of Focused Area Study (FAST). The FAST is a small area plan, approved by the <br />City Council in June of 2010, for the area surrounding the subject property. The FAST identifies the <br />subject property area as Station Area Village. <br />Station Area Village — FAST Excerpt <br />The area immediately adjacent to the Northstar station is envisioned as vibrant mixed -use district. As intensification q1' <br />development occurs over time, this district will include vertical mixed -use at the primary intersection to the transit station. <br />Residential uses are envisioned north of the station on both sides of Twin Lakes Parkway and adjacent to the park and tide <br />lot. Long term, housing could develop in conjunction with a parking strrecture as development intensifies and ridership <br />increases. Oce is along Twin Lakes Parkway south of the transit station, with larger mid -rise building framing the street <br />and smaller building further from Twin Lakes Parkway. The development is organitied to promote internal circulation for <br />streets and drives and easy pedestrian navigation. Connections between sidewalks, trails and publicgatl.�ering places are vital <br />to maintaining the success oj'commenial uses and attracting residents to the district. The character of Twin Lakes Parkway <br />is distinctly urban throughout the entire district combining an attractive, comfortable streetscape, while still functioning as a <br />collector roadway. The round -a -bout at the re- aligned intersection of 171 st and Twin Lakes Parkway facilitates the turning <br />movements of the projected traffic volumes Along the street storefronts and business occupy the ground level, while amenities <br />such as broad sidewalks and outdoorplatias with benches and landscaping and properly scaled lighting create a safe and <br />comfortable environment for pedestrians Trails along the wetland edges tie to with sidewalks and outdoorplatias. <br />On- street parking exists for small segments of Twin Lakes Parkway in, f ront of retail uses. In general, parking and <br />laadirzg areas should be located internal to the larger development blocks utilitiing shared or district parking to maximitie <br />development along the street frontage and further distance buildings from the rail line noise. In addition, extensive landscape <br />buffers should be planted and maintained on both sides oj'the rail line for noise attenuation. A strategic approach for <br />stormwater allows for building orientation toward both natural amenities arzd internal stormwater treatment ayitems, <br />bringing increased value to development. <br />N:\ Departments \(:oinmtinity llet-clopment \Planning \(:ase Files \(:UP \CU 15 -09 Morrell \CU 15 -08 sr I)Gdocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.