My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 BASR 05-26-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2015
>
05-26-2015
>
5.2 BASR 05-26-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2015 11:38:40 AM
Creation date
5/22/2015 11:38:00 AM
Metadata
Fields
Template:
City Government
type
BASR
date
5/26/2015
case
V 15-07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The 25 foot buffer strip is in place in order to protect the wetland characteristics and <br />functions as well as assure that structures can withstand the ebb and flow of natural <br />wetlands. Encroaching within this buffer is not intended to be allowed per city <br />ordinance. <br />2. The variance is actually for the 20 -foot wetland buffer strip setback as well which <br />does not allow for structures. This is basically two variances in one. <br />3. If the deck was a normal part of the townhome design, then it should have been <br />included with the original plan for the townhome construction. <br />4. Wetland Buffer signs must be placed along the wetland buffer. The homeowner <br />must be aware that they are not to mow, clear, or remove vegetation within the <br />buffer, even though it is under their deck. <br />5. It would be recommended to minimize the impact (10 feet out instead of 12 feet for <br />example). <br />N: \Departments \Community Development \Planning \Admin \Site Plan Review\2015 \05-08-2015 \Environmental COMMENT MEMO <br />5- 8- 2015.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.