Laserfiche WebLink
Total Estimated Project Costs <br />a. Public art piece materials: <br />Weathering steel (7ga, 10ga, 12ga), galvanized 18ga steel, <br />bearings, miscellaneous steel and parts <br />b. Transportation costs: <br />Mileage (from Fergus Falls, MN) <br />Minneapolis for materials <br />Fargo for materials <br />Three trips to Elk River for instillation <br />c. Installation costs, time and materials: <br />Concrete, rebar, anchor bolts <br />f. Future maintenance costs: <br />Replacement bearings as needed <br />$2,700 <br />355mi <br />120mi <br />925mi <br />1,400mi at $0.50 per mi <br />e. Any other costs or charges deemed relevant by the artist: <br />$700 <br />$500 <br />$25ea.* <br />Artist Compensation for Time and Talent $8,000 <br />$12,000* <br />*Total project cost does not include cost of possible future maintenance* <br />