Laserfiche WebLink
Hackground /Discussion <br />On March 16, 2014, the Elk River Economic Development Authority and the City Council approved a <br />purchase agreement, contingent upon approval of the CUP and rezoning applications. <br />Staff met with the applicant and their team on March 24, 2015 and discussed several aspects of the <br />project listed below: <br />Staff indicated that the property is currently zoned Business Park (BP) and that would be the <br />baseline for the PUD and CUP requirements. <br />Staff expressed concern with the proposed front yard setback of 10 feet. The BP district requires <br />25' front yard setbacks for parking adjacent to Twin Lakes Road, a major north south corridor <br />through the community. <br />Staff informed the applicant the ordinance requirements for landscaped islands and that all <br />parking areas shall be bound with concrete curbing. <br />Screening of utility equipment was discussed <br />Staff discussed driveway width requirements and discussion followed regarding vacating 170th <br />Circle. Staff directed the applicant to apply for a street vacation if they felt that was the best <br />solution. <br />Analysis <br />Comprehensive Plan <br />The Comprehensive Plan, approved by the City Council in May of 2014, guides the property with an <br />underlying land use of Focused Area Study (FAST). The FAST is a small area plan, approved by the <br />City Council in June of 2010, for the area surrounding the subject property. The FAST identifies the <br />subject property area as Station Area Village. <br />Station Area Village — FAST Excerpt <br />The area immediately adjacent to the Northstar station is envisioned as vibrant mixed -use district. As intensification of <br />development occurs over time, this district will include vertical mixed -use at the primary intersection to the transit station. <br />Residential uses are envisioned north of the station on both sides of Twin Lakes Parkway and adjacent to the park and ride <br />lot. Long term, housing could develop in conjunction with a parking structure as development inten lifies and ridership <br />increases. Office is along Twin Lakes Parkway south of the transit station, with larger mid -rise buildings in the street <br />and smaller buildingfurtherfrom Twin Lakes Parkway. The development is organitied to promote internal circulation for <br />streets and drives and eay pedestrian navigation. Connections between sidewalks, trails and publicgathezing places are vital <br />to maintaining the success of commercial uses and attracting residents to the district. The character of Twin Lakes Parkway <br />is distinctly urban throughout the entire district combining an attractive, comfortable streetscape, while stillfunctioning as a <br />collector roadway. The round -a -bout at the re- aligned intersection of 171 st and Twin Lakes Parkway facilitates the turning <br />movements of the prjetted trait volumes. Along the street storefronts and business occupy theground level, while amenities <br />such as broad sidewalks and outdoor platias with benches and landscaping arad properly scaled lighting create a safe and <br />comfortable environment for pedestrians. Trails along the wetland edges tie to with sidewalks and outdoor platias. <br />On- street parking existsfor small segments of •Twin Lakes Parkway in front of •retail uses. In general, parking and <br />loading areas should be located internal to the larger development blocks utilitiing shared or district parking to maximitie <br />development along the streetfrontage andfurther distance buildings from the rail line noise. In addition, extensive landscape <br />buffers should be planted and maintained on both sides of the rail line for noise attenuation. A strategic approach for <br />stormwater allowsfor building orientation toward both natural amenities and internal stormwater treatment ystems, <br />bringing increased value to development. <br />N: \Departments \Community DcN-clopment \Planning \Case Files \CUP \CU 15-08 Morrell \CU 15 -08 sr PC.docz