Laserfiche WebLink
Mr. Steve Wensman <br />March 17, 2000 <br />Page Two <br /> <br />3. There should be a 6-foot wide sidewalk constructed along the west side of the access road <br /> from Freeport Avenue for pedestrians to access the TCF site. <br /> <br />4. The dumpster for the TCF site is located at the southwest corner of the building. It is <br /> unclear how a garbage truck will access this. We assume that garbage pickup will happen <br /> at off-hours and the garbage truck will be able to enter and exit this area from the same <br /> direction and have free movements to back in and out of the site. <br />5. The landscaping plan should be reviewed carefully to ensure that no large trees are planted <br /> in City easements. The City does have sanitary sewer and watermain running across the <br /> boulevard area along Freeport Avenue. In fact, depending on what kind of berming and <br /> plantings are done in this area, there is a sanitary sewer manhole and water valve which <br /> may need to be adjusted. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br />Terry J:Maurer, P.E. <br /> <br />TJM:tw <br /> <br />O:\PROJ\809700j\0240\ltr 3-17-00 Wensman2.doc <br /> <br /> <br />