My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 04-17-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
04/17/2000
>
4.2. SR 04-17-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:39 AM
Creation date
5/17/2004 8:36:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/17/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br /> <br />ENGINEER8 - ARCHITECTS , PLANNERS <br /> <br />complete stages of preliminary plan production. <br /> Deliverables <br /> <br /> Meeting minutes of all formal meetings <br /> <br />TASK 4: SURVEY/IVIAPPING <br />The aerial photography that was done by Horizons, Inc., for the <br />Northstar Corridor MIS/EIS will be utilized to the fullest extent <br />possible in the preparation of preliminary engineering documents. <br />Digital mapping from the aerial photography will be developed <br />and used as the base map(s) for the proposed rail capacity <br />improvement projects. Approximately 38 lineal miles of mapping <br />will be required to encompass the areas of the 15 specified <br />improvements. We have specified a 209-foot wide <br />corridor, centered on the existing railroad mainline, as the basis for <br />our digital mapping requirements. A 400-foot wide corridor will be <br />mapped at all roadway-crossing locations to provide sufficient <br />information to develop profiles. Mapping in areas outside of those <br />~hat are directly affected by the proposed improvements is not <br />included as part of this Proposal. <br /> <br />Control surveys for the mapping will be conducted along the <br />Corridor. The control surveys will be conducted with survey grade <br />GPS units utilizing both Static and RTK observations. Horizontal <br />control will be at least NGS Second Order Class II and vertical <br />closure will be at least + 0.1'. The NAD83 (1986 adj.) County <br />Coordinate System ground values will be used as the survey <br />datum. <br /> <br />Detailed ground surveys will be conducted at the four proposed <br />bridge reconstruction locations to obtain the additional information <br />necessary to prepare preliminary bridge plans. Additional field <br />survey work will also be performed along portions of the west side <br />of the Northtown Yard and along the proposed 3r'~ main track <br />between Interstate and Coon Creek to pinpoint property lines. This <br />information will be used in the preparation of right-of-way exhibits <br />and easement descriptions in the areas where the proposed <br />construction limits may extend beyond the existing BNSF right-of- <br />way. <br /> <br />A BNSF flagman will be required to be present for all field work <br />done by the TKDA Team on BNSF right-of-way. We have included <br />the cost of such flagging services as part of our Proposal. TKDA is <br />also an approved facilitator of the BNSF's Contractor Safety <br />Orientation Program, and will provide training to all TKDA Team <br />and NCDA members as part of this Proposal. This training is <br /> <br /> Preliminary Engineering Propoeal <br />TOLTZ, KING, DUVALL, ANDERSON & ASSOCIATES, INC. <br /> <br />52 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.