Laserfiche WebLink
• Estimate of Site Improvements (cont'd) <br />191% Ave Open Field <br />- Topsoil and Seed S 3,000.00* -14m <br />Hillside Area Wide Park <br />- Parking Lot 60'X 200'& Roadway 20' X 2000' <br />- Class 5 Needed for Parking Lot & Road -1750 ton a $5.00 per ton S 8,750.00 <br />- Gates & Fencing 2.000.00 <br />TOTAL <br />• <br />L <br />Page 3 <br />S 10,750.00* <br />