My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.12. SR 03-20-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
03/20/2000
>
6.12. SR 03-20-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:38 AM
Creation date
5/17/2004 7:17:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Company <br /> CONSULTING ENGINEERS <br />February 24, 2000 <br />File: 809220J-0240 <br /> <br />Mr. Steve Wensman <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN <br /> <br />RE: MULVANEY POINT <br /> <br />Dear Mr. Wensman: <br /> <br />As requested, we have reviewed the revised information supplied for the Mulvaney Point <br />project. The submittal package consisted of a preliminary plat, preliminary grading drainage <br />and erosion control plan, preliminary sanitary sewer and watermain plan, and preliminary street <br />profile. The plans all had a revision dat.e' of Fe,~ruary..1,..5,5, 2000. Based on our review, we would <br />offer the following comments: ~, '"' ~' ~' .... <br /> <br />A. Preliminary Plat <br /> <br />The area labeled temporary cul-de-sac should be platted as a permar~ent cul-de-sac <br />and constructed as such. In the future if the road is extended to Tyler Street, the cul- <br />de-sac portion of the road can be removed and the right-of-way vacated. <br /> <br />· There should be a note shown on the preliminary plat indicating that the existing <br /> home and auxilary buildings are intended to be demolished. <br /> <br />The plat should show the required drainage and utility easements on all lots. <br /> <br />We had previously discussed with the developer that the 22 feet of additional right- <br />of-way shown along CSAH 13 was not all necessary. The development can provide <br />10 feet of additional right-of-way and the remainder as a trail easement along the <br />CSAH 13 frontage. <br /> <br />· The plat provides access control on the Tyler Street, CSAH 12, CSAH 13 frontage <br /> with the exception of the 60 foot opening for the proposed road. <br /> <br />B. Preliminary Grading Drainage And Control Plan <br /> <br />Grading plan indicates that the grading of the street and then lightly indicates an <br />approximate elevation that the lots may develop to. All of these grades seem <br />realistic for the development. It is our understanding that the developer will only <br />grade the street and necessary areas to blend into the lots. They will leave the lots <br />to be graded at the time that there is a building proposal for each individual one. <br /> <br />O:~°ROJ\809220j\0240\ltr 2-24-00 SWensman.doc <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.