Laserfiche WebLink
II <br /> I 111 PRELIMINARY COST ESTIMATE <br /> PREPARED FOR: CITY OF ELK RIVER <br /> P <br /> WOODLAND TRAILS PARK <br /> PREPARED BY: SANDERS AND ASSOCIATES, INC' <br /> I DATE: JUNE 4, 1990 <br /> NI UNIT TOTAL <br /> ITEM DESCRIPTION 0TY UNIT COST COST <br /> I <br /> FURNITURE AND SITE FEATURES <br /> 1 N� 8' Park Bench 20 EA $350'00 �7,OO�'O$7,000.00 <br /> 8' Picnic Table 12 EA $450'00 $5,400'00 <br /> Information Kiosks/Maps 18 EA $600'00 $10,800'00 <br /> Entry Signs 3 EA $1 ,200'00 $3,600'00 <br /> I Bridge - 40' Span 2 EA $12,000'00 $24,000'00 <br /> Floating Boardwalk 1 LS $15,000'00 $15,000'00 <br /> Stone Overlook 1 LS $15.,000.00 $15,000'00 <br /> I Picnic Shelter 1 EA $12,000'00 $12,000'00 <br /> Grills 12 EA $175'00 $2, 100'00 <br /> IILight Standards 12 EA $1 ,200'00 $14,400'00 III <br /> ASPHALT PAVING <br /> IParking Lots 3850 SY $8'00 $30,800'00 <br /> Entry Drive 4450 SY $8'00 $35,600'00 <br /> II8' Wide Trails 9600 SY $6' 15 $59,040'00 <br /> 1 GR4DING AND TRAIL CUTTING <br /> e <br /> / Grading 9600 SY $0'75 $7,200'00 <br /> Trail Cutting 2 LM $10,00()'00 $20,00().00 <br /> PLANTINGS <br /> N� 8' Evergreen Trees 35 EA $280'O0 $9,800'00 <br /> -- 3" Deciduous Trees • 75 E4 $275'00 $20,625.00 <br /> II Decidunus 5hrubs l8"-24" 225 E4 �l6'O0 ��,6UO'�O <br /> Evergreen Shrubs 18^ Spr . 100 EA $32'00 $3,200.00'OU <br /> IISUB-TOTAL $299, 165'00 ��� <br /> �� <br /> CONTINGENCY 10% $29,916.50 �- <br /> I ` ��329,081 '50 <br /> II <br />