Laserfiche WebLink
Memo to the City Council/AS 00-2 <br />March 20, 2000 <br />Page 4 <br /> <br />3. THAT PAYMENT OF SURFACE WATER MANAGEMENT FEE IN THE AMOUNT <br /> REQUIRED BY THE CITY FOR THE NEW LOT BEING CREATED BE PAID <br /> PRIOR TO RECORDING THE ADMINISTRATIVE. <br /> <br />THAT THE LOT SURVEY BE REVISED AND SUBMITTED TO THE CITY <br />ENGINEER FOR REVIEW AND APPROVAL PRIOR TO RECORDING THE <br />ADMINISTRATIVE SUBDIVISION WITH THE COUNTY. <br /> <br />THAT PRIOR TO INSTALLING A DRIVEWAY ACROSS THE COUNTY DITCH, A <br />PERMIT BE OBTAINED FROM SHERBURNE COUNTY AND THAT ANY <br />NECESSARY DITCH IMPROVEMENTS TO ACCOMMODATE THE DRIVEWAY <br />BE PAID FOR BY THE APPLICANT. <br /> <br />6. THAT A 50-FOOT RIGHT-OF-WAY BE GRANTED TO SHERBURNE COUNTY AS <br /> REQUESTED BY THE SHERBURNE COUNTY HIGHWAY ENGINEER. <br /> <br />THAT AT THE TIME DITCH IMPROVEMENTS ARE MADE, THE CITY SHOULD <br />INITIATE A PARTIAL VACATION OF THE DRAINAGE AND UTILITY <br />EASEMENT TO FIT THE MODIFIED DRAINAGE AREA WITH NO COST TO <br />THE LANDOWNER. <br /> <br />\\elkriver\sys\shrdoc\planning\stevewen\ccmmo\asOO-O2.doc <br /> <br /> <br />