Laserfiche WebLink
fee when due shall be cause for revocation of this License and shall <br />be a violation of the conditions and requirements of this License <br />for the purposes of the related operations authorized by Section 3 <br />of this License. <br /> <br />(e) <br /> <br />That Licensee is in strict compliance with all other terms, <br />conditions and requirements of this License, including specifically, <br />but not limited to, the operational requirements, performance <br />standards and environmental monitoring requirements of sections <br />4, 6, 7, and 8; and the requirements of sections 17 and 25 to make <br />prompt payment of all fees due to the City. No demolition debris <br />may be accepted at the demolition debris landfill if this condition <br />is not complied with. Licensee must immediately stop accepting <br />demolition debris upon written notice from the City that there is a <br />violation of this condition. <br /> <br />(04) Other Related Operations. No other operations or activities, whether or <br />not related to the Landfill, shall be permitted or allowed on the Landfill Property <br />unless this License is first amended to specifically allow such operations and to <br />specify the applicable conditions except mining activities or other operations <br />licensed or permitted separately by the City. <br /> <br />4.) Specific Additional Operational Requirements. <br /> <br />(01) Leachate Transmission Pipes. Licensee shall verify to the City every four <br />(4) years that the existing leachate transmission pipes do not leak. <br /> <br />(02) Backup Leachate Pumps. Licensee shall maintain backup pumps for use in <br />the event of pump failure at the wet well and leachate storage tank on-site, or shall <br />maintain provisions for restoring temporary leachate pumping within a 24-hour <br />period. <br /> <br />(03) Leachate Holding Tank. Licensee shall ensure that the leachate holding <br />tank is pumped out on a regular schedule. It shall be a violation of this License to <br />allow leachate to collect on the liner to a depth exceeding one foot due to the <br />leachate holding tank being full. <br /> <br />(04) Gas Venting System. Licensee shall conduct active landfill gas venting in <br />accordance with approved plans and shall construct additional phases of the <br />venting system at the time of final cover construction. <br /> <br />(05) Comprehensive Monitoring Plan Phase IV Water Quality Monitoring <br />Work Plan. The Comprehensive Monitoring Plan Phase IV Water Quality <br />Monitoring Work Plan which describes the sampling frequency, parameters, <br />protocols and reporting frequency for landfill gas, leachate, leachate piezometers, <br />leachate lysimeter, residential wells, groundwater monitoring wells and surface <br /> <br />9 <br /> <br /> <br />