My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.A. ERMUSR 04-15-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
04-14-2015
>
6.1.A. ERMUSR 04-15-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2015 4:15:27 PM
Creation date
4/15/2015 4:15:27 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
position's minimum job requirements included an engineering degree or equivalent <br /> experience. We have added this requirement back into the job description. <br /> Depending on the experience of the candidate selected, we will re-evaluate what <br /> expertise is needed for the budgeted addition of a Field Engineer. It is likely that the <br /> Field Engineer position will then evolve with essential functions shifting towards web <br /> based mapping. This position's hire would be delayed until the new Technical <br /> Services Superintendent is assimilated into ERMU and can help assess the <br /> department needs. <br /> • Page 4 of 4 r0-111EFIED D 1 ATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.