My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 04-14-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
04-14-2015
>
5.2. ERMUSR 04-14-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2015 4:08:59 PM
Creation date
4/15/2015 4:08:59 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River =-- <br /> Municipal Utilities <br /> 8.20b FINANCIAL RESERVES POLICY <br /> 1.0 Purpose and Summary <br /> In order to maintain stable rates and provide reliable services,Elk River Municipal Utilities <br /> (ERMU)requires financial buffers in the form of reserves to mitigate changes in costs or <br /> operational performance. For ERMU there are two utility funds,the Electric Utility and the <br /> Water Utility. These funds shall have separate reserves. Their reserve balances shall be <br /> classified as either Restricted for Debt Service or Unrestricted Designated Reserve. <br /> The target levels for these reserves shall be determined by the criteria herein. These target levels <br /> and target criteria will be reviewed annually, modified by Utilities Commission to support the <br /> long-term goals of ERMU, and adopted with the annual budget. Unless otherwise specified by <br /> bond covenants, these reserve balances shall be invested consistent with ERMU's Investment <br /> Policy(policy number 8.20a). _ <br /> 2.0 Electric Utility Reserve Classifications <br /> Restricted For Debt Service: This reserve is established to maintain compliance with bond <br /> covenants. <br /> The target level for this reserve shall be set at the level specified by bond covenants. <br /> Unrestricted Designated Reserve: This reserve is established to address the short-term financial <br /> variability inherent in operating an Electric Utility. Potential sources of this variability include <br /> but are not limited to: risks associated with natural disasters,reduction in overall customer usage, <br /> changes in total system load resulting from the actions of large customers, failure to achieve <br /> budgeted levels of net income, changes in cost of purchased power, changes in interest income, <br /> and general operational exposures. <br /> The target level for this reserve shall be set at the sum of 6 months operating expenditures less <br /> depreciation and less purchase power costs,plus the sum of next year's total principal and <br /> interest payments,plus one month budgeted average purchase power cost. The balance above <br /> this target level shall be unrestricted. <br /> 1 <br /> 122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.