My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.0. PRSR 04-08-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2015
>
04-08-2015
>
8.0. PRSR 04-08-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2015 9:04:05 AM
Creation date
4/7/2015 9:02:13 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
4/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total Estimated Project Costs <br /> a.Public art piece materials: $2,700 <br /> Weathering steel (7ga, 10ga, 12ga),galvanized 18ga steel, <br /> bearings,miscellaneous steel and parts <br /> b.Transportation costs: $700 <br /> Mileage (from Fergus Falls, MN) <br /> Minneapolis for materials 355mi <br /> Fargo for materials 120mi <br /> Three trips to Elk River for instillation 925mi <br /> 1,400mi at$0.50 per mi <br /> c.Installation costs,time and materials: $500 <br /> Concrete,rebar,anchor bolts <br /> f. Future maintenance costs: <br /> Replacement bearings as needed $25ea.* <br /> e.Any other costs or charges deemed relevant by the artist: <br /> Artist Compensation for Time and Talent $8.000 <br /> $12,000* <br /> *Total project cost does not include cost of possible future maintenance* <br />
The URL can be used to link to this page
Your browser does not support the video tag.