Laserfiche WebLink
Total Estimated Project Costs <br /> a.Public art piece materials: $2,700 <br /> Weathering steel (7ga, 10ga, 12ga),galvanized 18ga steel, <br /> bearings,miscellaneous steel and parts <br /> b.Transportation costs: $700 <br /> Mileage (from Fergus Falls, MN) <br /> Minneapolis for materials 355mi <br /> Fargo for materials 120mi <br /> Three trips to Elk River for instillation 925mi <br /> 1,400mi at$0.50 per mi <br /> c.Installation costs,time and materials: $500 <br /> Concrete,rebar,anchor bolts <br /> f. Future maintenance costs: <br /> Replacement bearings as needed $25ea.* <br /> e.Any other costs or charges deemed relevant by the artist: <br /> Artist Compensation for Time and Talent $8.000 <br /> $12,000* <br /> *Total project cost does not include cost of possible future maintenance* <br />