My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 04-06-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
04-06-2015
>
8.2. SR 04-06-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 12:49:36 PM
Creation date
4/3/2015 11:10:46 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4\\ <br /> Elk\, = F1k River cmvelMmmgnmrim <br /> River` <br /> Final Land Use and Roadway Plan <br /> After discussion with Parks, Planning Commission, and City Council, and collecting input from the <br /> general public, staff and property owners, a final land use and road scenario was selected.Taking most <br /> of the aspects of the third scenario and choosing "Roadway Option 2" with some modifications, a final <br /> land use and transportation plan was produced. Roadway Option 2 includes the re-alignment of CSAH <br /> 33,which would create an important east/west connection from US 169 through the study area. <br /> The Final Land Use Plan for the entire gravel mining area is shown on Figure 15. Once selected, final <br /> utility, transportation, and grading plans were completed, based on the preferred alternative. The Final <br /> Roadway Option is shown in Figure 16,which highlights the new roadways needed. <br /> Upon analyzing the constraints of the transportation and utility systems, a phasing plan was applied to <br /> the preferred land use scenario to be strategic in identifying near-term and long-term investment needs <br /> and to acknowledge that Elk River will not need to provide development opportunity in the entire 2,600 <br /> acres at once. When analyzing utility and transportation constraints and in discussions with property <br /> owners, it was necessary to develop a phasing plan to provide the City with a realistic and <br /> implementable plan that recognized the significant financial investments required to fully serve the <br /> entire study area. <br /> This study anticipates the needs for utilities, transportation, and stormwater infrastructure for "Phase 1" <br /> and "Phase 2" (through 2040) as highlighted in Figure 17. Phases 1 and 2 are 724 acres, and have been <br /> identified based on the anticipation completion of the mining operations. Below are the assumptions <br /> used when calculating land uses and lot coverage for the purposes of analyzing transportation, utility, <br /> and stormwater needs for the preferred land use scenario: <br /> Acreage- Acreage Number Lot Coverage(% Lot Coverage(% Impervious <br /> Phase 1 -Phase of and Square and Square Surface <br /> 2 Homes Footage)—Phase 1 Footage)— <br /> Phase 2 <br /> Low density 136 0 204 30% <br /> residential (1.5 u/a) <br /> Medium density 138 0 552 45% <br /> residential <br /> (4 u/a) <br /> Highway Business 78 114 20% 20% (993,168 75% <br /> (679,536 sq.ft) sq.ft) <br /> Commercial/Industri 178 80 25% 25% (871,200 75% <br /> al Flex(50/50) (1,938,420 sq.ft) sq.ft) <br /> Additionally, there is an opportunity for immediate, rural residential development in the areas <br /> designated as "residential" on the eastern side of US 169.These areas could develop without municipal <br /> utilities, if they were developed with the assumption that the homes in the development would <br /> eventually connect to urban services (once available). Residential development should occur as cluster <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.