My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.11. SR 04-06-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
04-06-2015
>
4.11. SR 04-06-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 9:44:46 AM
Creation date
4/3/2015 9:42:24 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Installation of Improvements. The Improvements will be installed at Developer's expense by <br />Developer as hereinafter provided. <br />(01) Developer shall construct and install at Developers sole expense all Improvements necessary <br />to fully complete the Development, including those Improvements identified in Exhibit D, attached <br />hereto, except as may otherwise be set forth in this Agreement. The installation of the <br />Improvements shall be in accordance with all applicable City ordinances, including the City <br />subdivision ordinance, and shall be subject to review, approval, inspection and authorization by the <br />City and /or its specialty consulting staff, as provided in this agreement. <br />(02) Deadline for Performance by Developer. Except as otherwise provided herein, Developer <br />agrees to complete all Improvements and perform all other acts as are required by the Subdivision <br />Ordinance, other applicable ordinances and the terms and conditions of this agreement, and <br />resolution No. 15 -14 and to do so on or before October 31, 2015, with the exception of the final <br />wear course of asphalt on streets. The final wear course on streets shall be installed between <br />August 15 and October 15 the year following the base layer of asphalt construction. The Developer <br />may, however, request an extension of time from the City. If an extension is granted, it shall be <br />conditioned upon updating the security posted by the Developer to reflect cost increases and the <br />extended completion date. Final wear course placement outside of this time frame must have the <br />written approval of the City Engineer. <br />(03) Approval of Contractor. The City reserves the right to approve or disapprove any <br />contractor selected by the Developer. <br />(04) Construction Plans. The construction, installation, materials and equipment shall be in <br />accordance with plans and specifications prepared by a licensed professional engineer and approved <br />by the City Engineer. Such plans and specifications shall be based upon such engineering surveys, <br />including soil borings and material tests, determined to be necessary by the City Engineer. <br />(05) Supervision and City Services. Construction and installation plans and activity shall be <br />reviewed by and subject to the supervision of the City. Developer will cause the contractor(s) to <br />inform the City's representatives of the schedule to complete the Improvements as required in the <br />approvals. City shall inspect all Improvements during and after construction for compliance with <br />approved specifications. Developer will notify the City Engineer or his designee at such times during <br />construction as the City Engineer requires for inspection purposes. <br />(A) The Developer shall instruct its engineer to provide adequate field inspection <br />personnel to assure an acceptable level of quality control to the extent that the Developer's <br />engineer will be able to certify that the construction work meets the approved City standards <br />as a condition of City acceptance. In addition, the City may, at the City's discretion and at <br />the Developer's expense, have one or more City inspectors and a soil engineer inspect the <br />work on a full or part -time basis. The Developer, its contractors and subcontractors, shall <br />follow all instructions received from the City's inspectors. The Developer's engineer shall <br />provide for on -site project management. The Developer's engineer is responsible for design <br />changes and contract administration between the Developer and the Developer's contractor. <br />The Developer or its engineer shall schedule a pre - construction meeting at a mutually <br />agreeable time at the City with all parties concerned, including the City staff, to review the <br />program for the construction work. <br />(06) Easements. The Developer shall convey to the City, prior to the final approval of plans and <br />specifications and at no cost to the City, all permanent and temporary easements for the installation <br />and maintenance of all Improvements determined to be necessary by the City. All such easements <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.