Laserfiche WebLink
May I0, 2004 <br />File: $2'! 79OJ-0240 <br /> <br />Mr. Scott Hadicker <br />Senior Planner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: ELK RIDGE CENTER <br /> * FINAL PLAT AND EASEMENT VACATION <br /> <br />Dear Mr. Hadicker: <br /> <br />As requested, we have reviewed the proposed easement vacations and final plat for the Elk Ridge <br />Center development As you are aware, this is the development located on Outlot A of the <br />Brentwood subdivision. Schoelt and Madson, Inc., prepared the documents we reviewed. Based <br />on our review, we would offer the following comments: <br /> <br /> i. The easement vacations requested are drainage and utility easements provided as part <br /> of the Brentwood Addition plat, drainage and utility easements orovided as pad of the <br /> /.4 ~ - ~rd <br /> Ridgewoo,~ b.,s~ ,~ Addition plat, and a drainage easement aton'g the south frontage of <br /> 197th Avenue. The larger drainage and utility easements used for actual storm water <br /> drainage off of the perimeter City streets will be re-granted through the final plat. The <br /> two conditions we would suggest as part of granting the easement vacations are that <br /> the appiicant ensure that there are no small utiiity uses for the perimeter drainage and <br /> utility easements requested for vacation, and the final plat be recorded to rededicate the <br /> drainage and utility easements needed for storm drainage. <br /> 2. The final plat of Elk Ridge Center proposes to divide the property into seven out!ots <br /> while providing the public rights-of-way for Holt Street and the realignment of 197~ <br /> Avenue. Obviously, as each outlot begins to develop into a commercial establishment, <br /> it will need to be reptatted. The two conditions we would recommend for the approval of <br /> the final plat are that the drainage and utility easements around the perimeter of the site <br /> · and along the street rights-of-way be dedicated on the this final pl~t, even though the <br /> tots that these drainage and utility easements would be over are currently outiots. Holt <br /> Street may be built before al! of the outlots are replatted, and those drainage and utility <br /> easements along the frontage and perimeters may be necessaw for the small utilities <br /> and/or other planned improvements. Secondly, access control should be granted along <br /> the TH 169 frontage as part of this plat. <br /> any questions regarding comments on either of these issues, please caii. <br /> <br />if you have <br />Sincerely, <br /> <br /> ~owarc-- P Green '"-' <br /> , ,. u, umpany <br /> <br />TJM:sw <br />Ltr*05 i 0~-~adic~er. doc <br /> <br />2550 Unh/ersityAvenue West , Suite 400N * St. Paul, MN 55114 ~ 651/644-4389 <br /> <br />fax 65%/644-9446 toll free 888/368-4389 <br /> <br /> <br />