My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. ERMUSR 01-09-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
01-09-2007
>
6.4. ERMUSR 01-09-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2015 2:46:36 PM
Creation date
3/27/2015 2:45:30 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Department—David Berg/Water Superintendent <br /> Water& Electric Technologies <br /> 1) Expanded water mains to Trott Brook's Vandenberg Addition, Eagles Marsh 2' ' <br /> Addition and River Park Addition. <br /> 2) Looped water main for Guardian Angels building project. <br /> 3) Connected 247 new water services to the water system for a total of 4,341. <br /> 4) Increased Security System customers by 123 for a total of 485. <br /> 5) Produced over 802 million gallons of water with a peak day of 6.34 million gallons, <br /> an increase of 15.1 % from the previous year. <br /> 6) Drilled a test well at Johnson Street Water Tower. <br /> 7) Awarded contracts for 2007 construction to loop water mains on County Road 40, <br /> County Road 12 and Twin Lakes Road. <br /> Electric Department - Glenn Sundeen/Line Superintendent <br /> Electric Department <br /> 1) Expanded electrical distribution system in Trott Brook 12th,Vandenberg Addition, <br /> Eagles Marsh 2nd, River Park 1st, and Otsego's Great River Centre. <br /> 2) Installed new 28 MVA transformer at West Bank#1. <br /> 3) Finished construction and energized Otsego Station. <br /> 4) Constructed 4 new underground feeders at Otsego Substation. <br /> 5) Constructed and energized new Station 14, bank#2 substation. <br /> 6) Constructed 2 new feeders from Station 14 to West Elk River Business Park. <br /> 7) Relocated overhead lines for HW 101 and Co. Rd. 42, Co. Rd. 33, Co. Rd. 40 and <br /> moved underground lines on Co. Rd. 1. <br /> 8) Added 323 electric meters to electric systems for a total of 8,859. <br /> 9) Purchased over 205 million KWH of energy with a peak day of 48.4 M.W. or an <br /> increase of approximately 6.2%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.