Laserfiche WebLink
Memo to the City Council/CU 00-2 <br />February 22, 2000 <br />Page 3 <br /> <br />5. THAT ANY NEW SIGNS CONFORM TO THE ELK RIVER SIGN ORDINANCE <br /> AND THAT A SIGN PERMIT BE OBTAINED PRIOR TO ANY INSTALLATION <br /> OF SIGNS. <br /> <br />6. THAT THE BUILDING BE CONNECTED TO CITY SEWER AND WATER. <br /> <br />\\elkriver\sys\shrdoc\planning\stevewenXccmmo\cu00-2.doc <br /> <br /> <br />