Laserfiche WebLink
Extend Double Track through West <br />Leg Minneapolis Junction Wye <br />MP 9.5 to MP 9.7 <br /> <br />Crossover <br />MP 10.3 <br /> <br /> Double Track from <br />Minneapolis Junction Wye to St. <br />Anthony (Midway Subdivision) <br /> MP 9.5 to MP 7.0 <br /> <br />Connect South <br />Runner to Main 1 <br /> <br />Crossover <br />MP 9.4 <br /> Crossover <br /> MP 10.0 <br /> <br />rNew <br /> <br />Third Main <br /> <br />MP 15.6 <br /> <br />Double Crossover <br />MP 13.8 <br /> <br />Construct Double <br />Track from 43rd Ave <br />MP 13.8 to MP 12.5 <br /> <br />Crossover <br />MP 11.5 <br /> <br />Extend Main 2 <br />MP 12.3 to 11.7 <br /> <br />Crossover <br />MP 11.1 <br /> <br />Crossover <br />MP 11.3 <br /> <br />Install 1200' <br />New Track <br /> <br />Bridge Widening at <br />Mississippi Way <br />MP 16.6 <br /> <br />Roadway would be <br />Reconstructed to <br />Parallel "Future <br />Double Track" <br /> <br />Extend Double <br />Tracks Near <br />35th Ave <br /> <br /> ~i~~t~ Draft Environmental Impact Statement <br />NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY l BRW <br /> <br />w <br /> <br />1" = 2,788'(approx) <br /> <br /> · Figure 2.34 <br />Potential Track Improvements- Fridley/Minneapolis <br /> <br />39935.0410-1/00-I <br /> <br /> <br />