My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.8. SR 02-22-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
02/22/2000
>
4.8. SR 02-22-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:36 AM
Creation date
5/12/2004 8:04:05 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northstar Corridor Commuter Rail <br />Capacity Improvements Proposed by Burlington Northern Santa Fe (1999 Dollars) <br /> <br />IMPROVEMENT <br />1. Construct double track through Northtown Yard (43rd Avenue to 35th Avenue) with double <br /> crossover at 43rd' <br /> <br />2. Install CTC si~aling system from Big Lake to Coon Creek on Staples Subdivision. <br />3. Install CTC signaling system from Harrison Street to Holden Street on Wayzata <br /> Subdivision. <br /> <br />4. Construct double crossovers using #24 turnouts at Becker (MP 57.3), MP 51.2, MP 45.1, <br /> Elk River (MP 39.3), MP 32.9, and Ramsey (MP29.3) on Staples Subdivision. <br />5. Construct double track from Becker to Big Lake. <br />6. Upgrade "old main 2" on Midway Subdivision to 30mph/25mph. <br />7. Upgrade siding from Holden Street to Harrison Street to main line and extend double track <br /> through west leg of the Minneapolis Junction Wye. <br />8. Construct crossover using #24 turnouts at MP 11.3 on Wayzata Subdivision to allow <br /> Eastbound commuter trains to cross over into the depot. <br /> <br />o <br /> <br />Extend double track from Minneapolis Junction Wye to St. Anthony on Midway <br />Subdivision. Move crew-change location from Boom Island to Union Yard. <br />Upgrade crossover at MP 11.11 on Midway Subdivision to 30mph/25mph. <br />Upgrade main line on Midway Subdivision west of University (MP 11.7) to 45mph/45mph. <br />Extend Midway Subdivision Main 2 from MP 11.7 to MP 12.3. <br /> <br />10. <br />11. <br />12. <br /> <br />13. Construct sidings at Anoka and Coon Creek on Staples Subdivision to allow LMIN8101 to <br /> work off of the main line. <br />14. Construct third main from Coon Creek to Interstate. <br />15. Connect South Runner as continuous track from Interstate to Main 1 on the St. Paul <br /> Subdivision at University. <br /> <br />Source: Northstar Corridor Commuter Rail Capacity Analysis - June 30. 1999 memo from BNSF. <br /> <br />Northstar Corridor Commuter Rail <br />Capital Cost Estimate - Working Draft <br /> <br />October 21, 1999 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.