My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 02-22-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
02/22/2000
>
4.7. SR 02-22-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:36 AM
Creation date
5/12/2004 8:03:39 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB-I?-OO 08:4?AMFROM-ELK RIVER UTILITIES B12441Bogg T-418 P.02/03 F-54Z <br /> <br />Page 2 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />February 15, 2000 <br /> <br />6.1 Revigw and Con.~ider Bid Tabulation for Electric Wire Bids <br /> <br />On February 9, 2000, bids were received to supply and deliver approximately <br />132,500 feet of electric wire for 2000 construction projects. Staff prepared a <br />bid tabulation for Commission review, along with recommendations. <br /> <br />John Dietz moved to approve the purchase as follows: <br /> <br />7500 LF 500 MCM <br />40000 LF 4/0 UP.D Cable <br />60000 LF 1/0 URD Cable <br />10000 LF Brenau 600 V Cable <br />15000 LF Converse 600 V Cable <br />10000 LT Sweetbrair 600 V Cable <br /> <br />Border States <br />Burmeister Electric <br />Wesco <br />Wesco <br />Wesco <br />Wesco <br /> <br />to eliminate bids from King Wire and Resco, because of qualified bids, <br />fluctuations in their quoted prices, time restraints and non-conformance <br />to specifications. <br />George Zabee seconded the motion. Motion carried 3-0. <br /> <br />6.2 Review Annual_Report tO Cit~Council <br /> <br />Bryan Adams presented the 1999 Annual Report to City Council for Commission <br />review and consideration, Specific major accomplishments of 1999 and goals for <br />2000 were reviewed. <br /> <br />6.3 Review. .Revised Safety Manual <br /> <br />Bryan Adams presented to Commission the revised and up-dared Safety Manual. <br />Discussion followed with comments from Glenn Sundeen and Bryan Adams, <br /> <br />6.4 Review Air (~9nditioningl,oad. Control <br /> <br />A report prepared by Vance Zehringer, was reviewed and discussed. The report <br />contained a Situation Analysis addressing the air conditioning program, with <br />options to be considered. After lengthy consideration, Bryan Adams suggested <br />fl~at two years of education for consumers including advertising, brochures and <br />bill stuffers be implemented, with promotion of heat pumps. At the end of two <br />years the situation will again be reviewed, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.