Laserfiche WebLink
Feb. 8, 1983 BIKEWAYS -45- <br /> v. Class of Bedding for R.C. Pipe if other than is not a participating item. Larger bicycle path pi jects <br /> standard, should be constructed by the contract letting prc,cess. <br /> Force account agreements require the approval and sig- <br /> vi. Any structure carrying a 500 cubic feet per nature of the city or county engineer, the district state <br /> second or more design flood shall Have the pertinent hy- aid engineer and the Director,Office of State Aid(the same <br /> draulic data for the design flood shown in the plans. as plans). Submit three signed copies. Force account agree- <br /> ments must be approved prior to construction to be eligible <br /> vii. Due to maintenance considerations the mini- for funding. <br /> mum culvert size shall be 18 inch diameter. <br /> G.SUMMARY <br /> viii. Indicate the direction of flow of all drainage <br /> with arrows. (This includes areas where there is natural Plans for bicycle routes and bicycle lanes can be quite <br /> drainage and areas where drainage structures are not brief. The geographic location of the project shall be <br /> required). portrayed on the title sheet. Show a plat or plan view <br /> clearly showing project route. Types and location of signs <br /> j. Stationing of corporate limits of municipalities, shall be shown. Types of signs shall be referenced to the <br /> applicable Standard Sign Manual Sign Number. Striping <br /> k. Stationing of equations,exceptions and temporary location, types, quantities and details, if applicable, shall <br /> connections, be shown. A tabulation of estimate quantities shall be <br /> included in the plans. <br /> 1. All section corners,land ties, etc. <br /> Plans for bicycle paths shall show the proposed align- <br /> m.Grading quantities in agreement with those on ment, grades, typical section and all other pertinent fea- <br /> cross sections and statement of estimated quantities. tures. These items shall be in accordance with the bikeway <br /> engineering standards. <br /> n. Sources of selected material and locations of <br /> designated borrow pits and balances showing where selected <br /> material or borrow materials is to be placed. <br /> o. All removal and construction items shall be shown <br /> as notes or in tabulation form. (Culverts, storm sewer, <br /> clearing and grubbing, sodding etc.). <br /> p. All construction items not covered by Mn/DOT <br /> Standard Plates shall be detailed on appropriate plan sheets. <br /> q. A scale which will not require crowding of topo- <br /> graphy and notes. <br /> r. A "North" arrow on each plan and profile sheet. <br /> E. CROSS-SECTION sheets are required for `Bicycle <br /> Trail"projects as follows: <br /> 1. Cross culverts, cattle passes and subsurface drains. <br /> This gives a better picture of the planned drainage and pro- <br /> vides an opportunity to check the structures for strength <br /> classifications. <br /> 2. Side slope ratios and recovery area width. ` <br /> F. FORCE ACCOUNT AGREEMENT PROJECT <br /> Smaller projects can be processed as Force Account <br /> Agreement projects (see forms in State Aid Manual). This <br /> eliminates the contract letting procedures. The paragraph <br /> referring to Preliminary Engineering shall be deleted as this <br /> • <br />