My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. PRSR 07-13-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
1993-2000
>
1994
>
07-13-1994
>
7.0. PRSR 07-13-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2015 3:53:39 PM
Creation date
3/20/2015 3:53:39 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
7/13/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SOFTBALL FIELD CONSTRUCTION ESTIMATES PER FIELD <br /> Backstop - 1 each $ 3,500 <br /> Outfield Fence 460' of 6' high $9.00/if 4,140 <br /> Baseline Fence 410' of 6' high $9.00/if or 8'high add$3.00/If 3,690 <br /> (fully enclose one side, 120' on other side) <br /> Ag lime - 200 T (4" deep) 2,500 <br /> Bases 400 <br /> Irrigation: <br /> 2" pipe - 1500 lf 525 <br /> 3" pipe - 800 lf 520 <br /> Swing joints - 22 each $15.00 660 <br /> I-40 sprinkler heads - 22 each $60.00 2,640 <br /> Infield sprinkler heads - 1 each 200 <br /> Valve boxes - 6 each $25.00 150 <br /> Pipe fittings 500 <br /> Valve wire 500 <br /> Zone valves - 6 each $35.00 210 <br /> Enclosed cabinet - 1 each 200 <br /> Controller - 1 each 900 <br /> Grass seed 1,000 <br /> Fertilizer 600 <br /> • Herbicides <br /> Per Field $ 23,035 <br /> This cost estimate includes contractor installed fencing with the City <br /> Street/Park Department doing the grading, leveling of ag-lime, irrigation, <br /> installation, and turf establishment. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.