Laserfiche WebLink
• SOFTBALL FIELD CONSTRUCTION ESTIMATES PER FIELD <br /> Backstop - 1 each $ 3,500 <br /> Outfield Fence 460' of 6' high $9.00/if 4,140 <br /> Baseline Fence 410' of 6' high $9.00/if or 8'high add$3.00/If 3,690 <br /> (fully enclose one side, 120' on other side) <br /> Ag lime - 200 T (4" deep) 2,500 <br /> Bases 400 <br /> Irrigation: <br /> 2" pipe - 1500 lf 525 <br /> 3" pipe - 800 lf 520 <br /> Swing joints - 22 each $15.00 660 <br /> I-40 sprinkler heads - 22 each $60.00 2,640 <br /> Infield sprinkler heads - 1 each 200 <br /> Valve boxes - 6 each $25.00 150 <br /> Pipe fittings 500 <br /> Valve wire 500 <br /> Zone valves - 6 each $35.00 210 <br /> Enclosed cabinet - 1 each 200 <br /> Controller - 1 each 900 <br /> Grass seed 1,000 <br /> Fertilizer 600 <br /> • Herbicides <br /> Per Field $ 23,035 <br /> This cost estimate includes contractor installed fencing with the City <br /> Street/Park Department doing the grading, leveling of ag-lime, irrigation, <br /> installation, and turf establishment. <br /> • <br />