My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. PRSR 02-09-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
1993-2000
>
1994
>
02-09-1994
>
7.3. PRSR 02-09-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2015 3:02:46 PM
Creation date
3/20/2015 3:02:46 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
2/9/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"'ity of � TO: MAYOR & CITY COUNCIL <br /> Jlk River FROM: PHIL HALS, STREET/PARK SUPT• )" <br /> DATE: JANUARY 20, 1994 <br /> SUBJECT: WOODLAND TRAILS CONSTRUCTION <br /> SCHEDULE <br /> The archaeological study of Woodland Trails Park was completed <br /> in November, 1993 without finding any historical or <br /> archaeological sites in the proposed construction area. This <br /> means that we can proceed with the entrance road, parking lot, <br /> and trails in 1994 . <br /> I would propose the following construction schedule for 1994: <br /> 1 . Rough grade the entrance road and parking lot with a <br /> rental dozer. <br /> 2 . Level subgrade and install 1700 ton of Class 5 base with <br /> City equipment. <br /> 3 . Plow in electrical wire and set bases for 12 street lights <br /> with City equipment. <br /> • 4 . Grade crushed rock trails and install 1300 ton of crushed <br /> rock delivered by others, installed by City equipment. <br /> 5 . Grade bituminous trails and install 2500 ton of Class 5 <br /> base with City equipment. <br /> 1995 Schedule <br /> 1 . Fine grade and pave the 8600 lineal feet of trails with <br /> 1300 ton of bituminous with City equipment. <br /> 2 . Install 12 street light fixtures . <br /> 3 . Fine grade and pave the entrance road and parking lot with <br /> 1000 ton of bituminous with City equipment. <br /> This schedule is based on the assumption that Woodland Trails <br /> Park will be the major construction project for 1994 and 1995 . <br /> As you will note from the quantities, this project will take <br /> many hours of Street/Park department time to complete. <br /> P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.