My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 01-18-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
01/18/2000
>
4.2. SR 01-18-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:34 AM
Creation date
5/11/2004 7:54:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with greater detail and specificity to satisfy final environmental impact statement <br />requirements. The Preliminary Design Plan is a plan that identifies: <br /> <br />Preliminary design plans for the physical design of facilities, including location, <br />length, and termini of routes; general dimension, elevation, alignment, and. <br />character of routes and crossings; approximate station locations; and related park <br />and ride, parking, and other transportation facilities; and a plan for handicapped <br />access; and <br />Preliminary plans for intermodal coordination with bus operations and routes; <br />ridership; capital costs; operating costs and revenues, and sources of funds for <br />operating subsidies; funding for final design, construction, and operation; and an <br />implementation method. <br /> <br />The preliminary design plan includes the preliminary or draft environmental impact <br />statement for the commuter rail facilities proposed. <br /> <br />Final desiqn plan consists of a commuter rail transit plan that includes the items in the <br />preliminary design plan and the preliminary engineering plan for the facilities proposed <br />but with greater detail and specificity needed for construction. The final design plan <br />must include, at a minimum: <br /> <br />Final plans for the physical design of facilities, including the right-of-way <br />definition; environmental impacts and mitigation measures; intermodal <br />coordination with bus operations and routes; and civil engineering plans for <br />vehicles, track, stations, parking, and access, including handicapped access; and <br />Final plans for civil engineering for communication, and other similar facilities; <br />operational rules, procedures, and strategies; capital costs; ridership; operating <br />costs and revenues, and sources of funds for operating subsidies; financing for <br />construction and operati(~n; an implementation method; and other similar matters. <br /> <br />The final design plan must be stated with sufficient particularity and detail to allow the <br />department to begin the acquisition and construction of operable facilities. <br /> <br />The commissioner of transportation may use a design-build method of project <br />development and construction for commuter rail facilities. Notwithstanding any law to <br /> <br />Commuter Rail System Plan 4-14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.