My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORD 15-10
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
2010 - 2019
>
2015
>
ORD 15-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2015 10:53:25 AM
Creation date
3/17/2015 11:21:02 AM
Metadata
Fields
Template:
City Government
type
ORD
date
3/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Achieve at least 03.55" volume reduction from all impervious surfaces if the site <br />is new development or from the new and /or fully reconstructed impervious <br />surfaces for a redevelopment site. <br />ii. Remove 75% of the annual TP load from all impervious surfaces if the site is <br />new development or from the new and /or f Xy reconstructed impervious <br />surfaces for a redevelopment site. <br />iii. Options considered and presented shall examine the merits of relocating project <br />elements to address v in soil conditions and other constraints across the <br />site. <br />Alternative #2: <br />Applicant Attempts to Come with theFo11owin_g Conditions: <br />i. Achieve volume reduction to the maximum extent 12zacticable. <br />ii. Remove 60% of the annual TP load from all impervious surfaces if the site is <br />new development or from the new and/or fufly reconstructed imp envious <br />surfaces for redevelopment site. <br />iii. Options considered and presented shall examine the merits of relocating project <br />elements to address, varying soil conditions and other . constraints across the <br />site. <br />Alternative #3: <br />Off--site Treatment Mitigation equivalent to the performance of 1.1 inches of volume reduction <br />for new development or redevelopment as described above in this section (including <br />banking or cash) can be performed off -site to protect the receiving water body. Off -site <br />treatment shall be achieved in areas selected in the following order of preference: <br />i. Locations that Meld benefits to the same receiving, water that receives runoff <br />from the original construction activity. <br />ii. Locations within the same Department of Natural Resource (DNR) catchment <br />area (Hydrologic Unit 08) as the original construction activity. <br />iii. Locations within the next adjacent DNR catchment area upstream. <br />iv. Locations anxwhere within the community's jurisdiction. <br />Imp ervious Surface Area Calculations shall include all disturbed /graded soil areas due to <br />soil compaction impacts,, unless Soil Protection /Compaction Remediation specifications <br />have been iuicoMorated into the Proposal (Plan Set, Stormwater Management Plan, etc.) and <br />are approved by the City Engineer. <br />Designers shall be required to provide estimates of BMP -site specific infiltration rates to the <br />CitLgineer for approval prior to site plan review, For information on estimation of <br />infiltration rates see the Minnesota Stormwater Manual t stormwater. ca.state.mo.us . <br />The MIDS Desi Sequence Flowchart can be found in the Minnesota Stormwater Manual: <br />ht s tormwater.12ca.s tate.mn.us index. h Flexible treatment options. <br />All volume control practices and site desio specifications shall conform to the current <br />version of the Minnesota Stormwater Manual. <br />b. Stormsewer.ci hn All stormwater sizing must be sized according to the City of Elk River <br />Engineering Design Standards Manual. <br />IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.