My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a. ERMUSR 03-17-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
03-17-2015
>
6.1.a. ERMUSR 03-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2015 3:12:50 PM
Creation date
3/13/2015 3:12:50 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Interviews for the Billing Specialist position were held on Friday March 6. This position <br /> was posted internally. The vacant Customer Service Specialist position created by filling <br /> the Billing Specialist position will be posted and advertised this week. <br /> • An ad for the vacant Water Operator position was posted and sent to the League of <br /> Minnesota Cities and The Elk River Star News. I hope to conduct interviews for this <br /> position the week of April 7. <br /> • Mark Fuchs, Eric Volk, and I met with representatives from TKDA, a full-service <br /> engineering, architectural, and planning firm headquartered in Saint Paul, MN. We <br /> invited TKDA to ERMU to get a better understanding on the process for evaluating our <br /> field services and administration facility needs as we do some long term planning. <br /> • My annual review is scheduled for the April Commission meeting. An online survey will <br /> be used again to conduct the review. As in the past,this will be a 360° review with the <br /> Commission, direct reporting managers, and the City Administrator participating in the <br /> review process. If the Commission is interested in altering the review questions or <br /> process,please provide suggestions or direction at the March Commission meeting. <br /> II <br /> ill <br /> • IP—OWERED IT <br /> Page 2 of 2 NATURE <br /> Reliable Public <br /> Power Provider POWERED T O $ E 0.V E <br /> 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.