My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 03-17-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
03-17-2015
>
4.1. ERMUSR 03-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2015 3:09:36 PM
Creation date
3/13/2015 3:09:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. IEEE Statistics <br /> When using reliability metrics, a good place to start is with the industry standard metrics found in the IEEE <br /> 1366 guide. For each individual utility, the eReliability Tracker performs IEEE 1366 calculations for <br /> System Average Interruption Duration Index (SAIDI), System Average Interruption Frequency Index <br /> (SAIFI), Customer Average Interruption Duration Index (CAIDI), Momentary Average Interruption <br /> Frequency Index (MAIFI) and Average Service Availability Index (ASAI). <br /> When collecting the necessary data for reliability indices, utilities often take differing approaches. Some <br /> utilities prefer to include information as detailed as circuit type or phases impacted, while others include <br /> only the bare minimum required. In all cases, the more details a utility provides, the more practical their <br /> analysis will be. As a basis for calculating these statistics in the eReliability Tracker, the following are <br /> required to create an outage in the system: <br /> -Total number of customers served on the day of the outage <br /> -Time and date when the outage began <br /> -Primary cause of outage <br /> -Address where the outage was located <br /> It is important to note that the time when the outage ended is not required in case the outage is ongoing; <br /> therefore, outages without end dates at the time of the report analysis are not included in the indices that <br /> measure duration, such as SAIDI and CAIDI. However, they are included in the calculations measuring <br /> interruption frequencies, such as SAIFI or MAIFI, as well as in the analysis of outage causes. <br /> Due to the differences in how some utilities analyze major events (MEs) relative to their base statistics, it <br /> is important to note how they are calculated and used in this report. An example of a major event could be <br /> severe weather, such as a tornado or thunderstorm, which can lead to unusually long outages in <br /> comparison to your distribution system's typical outage. In the eReliability Tracker and in this report, the <br /> APPA major event threshold is used, which is a calculation based directly on outage events, rather than <br /> event days. The major event threshold allows a utility to remove outages that exceed the IEEE 2.5 beta <br /> threshold for events. The threshold takes into account the utility's past outage history up to 10 years in <br /> order to make this calculation. In the eReliability Tracker, if a utility does not have at least 36 outage <br /> events prior to the year being analyzed, no threshold is calculated; therefore, the field below showing your <br /> utility's threshold will be blank and the calculations without MEs in the SAIDI section of this report will be <br /> the same as the calculations with MEs for your utility. More outage history will provide a better threshold <br /> for your utility. <br /> Your utility's major event threshold is (minutes). <br /> If you wish to remove major events, the threshold calculated above is important to note because it impacts <br /> your SAIDI analysis. For the next year, based on your utility's outage history, any event with a SAIDI <br /> greater than minutes is considered as a major event and can be removed in your <br /> analysis. <br /> The tables in this section can be used by utilities to better understand the performance of their electric <br /> system relative to other utilities nationally and to those within their region or size class. In the SAIDI <br /> section, indices are calculated for all outages with and without major events; furthermore, the data are <br /> broken down to show calculations for scheduled and unscheduled outages. For each of the reliability <br /> 1 If there is no major event threshold calculated for your utility,these fields are left blank and the calculations in this report including Major Events and excluding <br /> them will be the same.Your utility must have at least 36 outage events recorded in the eReliability Tracker in order to calculate a Major Event Threshold. <br /> 3 <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.