Laserfiche WebLink
<br /> <br /> <br /> <br />A trunk line extension from the wastewater treatment facility extending from the existing Waste <br /> <br />Water Treatment Plant (WWTP) to the Phase 1 area. While a portion of Phase 1 may be able to <br />be immediately served by existing sanitary sewer pipelines, it would be expected to fully serve <br />Phase 1, Phase 2, and the remaining portion of the Development Reserve, this trunk line would <br />be needed. The recent expansions of the WWTP did take into consideration development of <br />Phase 1. <br /> <br />As development warrants and city policy dictates, a water tower will be needed during Phase 1. <br /> <br /> <br />Utilize existing grades to consider regional stormwater ponds. <br /> <br /> <br />Additional wells and a water treatment plant (WTP) should be constructed when water demand <br /> <br />warrants their construction. More detailed planning will be needed to determine the exact <br />timing of these improvements. <br /> <br /> <br /> <br /> <br /> <br />Next Steps <br />The full report is enclosed for reference and review. This draft will move forward to the Planning <br />Commission on March 24, 2015, and then be considered for approval by the City Council on April 6, <br />2015. <br /> <br />If you have any questions, please feel free to contact me by telephone at (763) 231-4863 or by email at <br />brothstein@wsbeng.com. <br /> <br /> <br />