Laserfiche WebLink
07/01/96 13:41 e a002 <br /> • Cost Estimate Plan D <br /> Phase 1 (4 Fields) <br /> Grading $ 41,500 <br /> Parking Lot CL-5 160 Cars 125' x 450" 1875T 13,125 <br /> Driveway 24' x 600' 480 T. @ 3,360 <br /> Well and Pump 9,000 <br /> Irrigation 22,500 <br /> Backstops 4 each @ 4,000 16,000 <br /> Baseline Fences 10' x 120' w/T.T.C. Rail @ 13.50/1f. 13,000 <br /> Outfield Fences 8' w/Top Rail @ 11.00/1f. 22,000 <br /> Gates 2 each @ 500.00 1,000 <br /> Ag Lime 500 T/field Material only 6.50/T. 13,000 <br /> Delivery 6.00/T. 12,000 <br /> Seed and Fertilizer 7,000 <br /> 10% Contingency 17,000 <br /> Sales Tax 6,000 <br /> $196,485 <br /> • Phase II (2 Fields) <br /> 33,500 <br /> Grading <br /> Road and parking Lot CL-5 (80 Cars) 125 X 225' <br /> 1000T @ $7.00 7,000 <br /> Irrigation 12,500 <br /> Backstops 2 each @ 4,000 8,000 <br /> Baseline Fences 10' x 120' W/T & B Rail 13.00/1f. 6,500 <br /> Outfield Fences 12,000 <br /> Gate 1 each @ 500.00 500 <br /> Ag Lime 500 T/field Material 6.50/T 6,500 <br /> Seed and Fertilizer 3,500 <br /> 10% Contingency 9,000 <br /> Sales Tax 3.000 <br /> $108,000 <br /> s:\offsite\costest.doc <br /> • <br />