My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. PRSR 06-14-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
1993-2000
>
1995
>
06-14-1995
>
7.0. PRSR 06-14-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 2:51:01 PM
Creation date
3/6/2015 2:51:01 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
6/14/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Establish some trail fee on a per lot basis whereby those funds <br /> could be dedicated to specifically trail construction. The city would <br /> then install the trail using these funds. <br /> • Continue with the city's current requirements which has the <br /> developer dedicate the land for the trail when necessary, and have <br /> no responsibility toward financing or constructing trails. <br /> Recommendation <br /> It is recommended the Park and Recreation Commission consider the options <br /> mentioned above or other considerations for developer's responsibilities <br /> towards trail construction. These recommendations can then be forwarded to <br /> the Planning Commission and City Council for their consideration to be <br /> incorporated into the subdivision ordinance under park dedication <br /> requirements. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.