Laserfiche WebLink
NORTHSTAR CORRIDOR MAJOR INVESTMENT STUDY <br /> COMMUTER RAIL SYSTEM - SERVICE CONCEPT B <br /> PRELIMINARY CAPITAL COST ESTIMATE (1999 DOLLARS) <br /> SEGMENT K - EAST ST. CLOUD TO RICE APPROX. LENGTH (MI): 15.0 <br /> COMMUTER RAIL POTENTIAL CAPACITY ADDITIONAL CAPITAL <br /> UNIT BASIC ELEMENTS IMPROVEMENTS IMPROVEMENTS <br /> COST ELEMENT UNIT COST <br /> QUANTITY COST QUANTITY COST QUANTITY COST <br />STATION (RICE) <br />--~I~F~)R-I~,~S-HELTER, LIGHTING, FURNISHINGS, ETC. EA 375,000 2 750,000 <br />TICKET VENDING MACHINE EA 115,000 _ 2 230,000 <br />PUBLIC ADDRESS & VMS EA 105,000 2 210,000 <br />SITE DEVELOPMENT / INCIDENTALS EA 50,000 I 50,000 <br />SURFACE PARKING SPACE 1,500 100 150,000 __ <br />PROPERTY ACQUISITION ACRE 100,000 I 100,000 <br />SUBTOTAL 1,490,000 <br />TRACKWORK <br />---~P~A'CK: 136# RAIL/CONCRETE TIES (NEW/UPGRADE) MI 623,000 <br />TURNOUT: #20 (NEW/UPGRADE) EA 170,000 <br />TURNOUT: #24 (NEW/UPGRADE) EA 185,000 <br />CROSSOVER: #20 (NEW/UPGRADE) EA 345,000 <br />C~(~SSOVER: #24 (NEW/UPGRADE) EA 378,000 <br />CROSSING SURFACE (NEW/UPGRADE) FT 675 <br />SUBTOTAL ' ' <br />CIVIL I STRUCTURES <br />--- EA~T~W-~-~-t~ STRUCTURES ES <br />MODIFY STRUCTURES LS <br />SUBTOTAL - <br />SYSTEMS <br />$1GNALING/CTC (NEW/UPGRADE) MI 75,000 <br />CONTROL POINT: 1-SWITCH (NEW/UPGRADE) EA 563,000 <br />CONTROL POINT: 2-SWITCH (NEW/UPGRADE) EA 703,000 <br />CONTROL POINT: 4-SWITCH (NEW/UPGRADE) EA 849,000 <br />CROSSING SIGNALS (NEW/UPGRADE) EA 270,000 - _ <br />SUBTOTAL - <br />i RIGHT.OF-WAY SF 4.00 - <br />CONSTRUCTION SUBTOTAL 1,490,000 <br />ADD-ONS <br />ENGINEERING, PROJ MGMT, ADMIN, START-UP, INSURANCE (20%) 298,000 <br />CONTINGENCY (20%) 298,000 <br />TOTAL (1999 DOLLARS) 2,086,000 <br /> <br />BRW, In~ [~ ~ /r~ [~ ~ Con-b-01.xls[SEG'" ~2/03/98 <br /> <br /> <br />