Laserfiche WebLink
NORTHSTAR CORRIDOR MAJOR INVESTMENT STUDY <br /> COMMUTER RAIL SYSTEM - SERVICE CONCEPT B <br /> PRELIMINARY CAPITAL COST ESTIMATE (1999 DOLLARS) <br /> SEGMENT F - ELK RIVER TO BIG LAKE APPROX. LENGTH (MI): 9.0 <br /> <br /> COMMUTER RAIL POTENTIAL CAPACITY ADDITIONAL CAPITAL <br /> UNIT BASIC ELEMENTS IMPROVEMENTS IMPROVEMENTS <br /> COST ELEMENT UNIT COST <br /> QUANTITY COST QUANTITY COST QUANTITY COST <br />STATION (BIG LAKE) <br /> "PLATFORM, SHELTER, LIGHTING, FURNISHINGS, ETC. EA 375,000 2 750,000 <br /> TICKET VENDING MACHINE EA 115,000 2 230,000 <br /> PUBLIC ADDRESS & VMS EA 105,000 2 210,000 <br />- SITE DEVELOPMENT/INCIDENTALS EA 150,000 1 150,000 <br /> SURFACE PARKING SPACE 2,000 200 400,000 <br /> PROPERTY ACQUISITION ACRE 140,000 2 280,000 <br />-'- SU-B-TOTAL 2,020,000 <br />TRACKWORK .................... <br />' TRACK: 136# RAIL/CONCRETE TIES (NEW/UPGRADE) MI 623,000 <br />TURNOUT: #20 (NEW/UPGRADE) EA 170,000 <br />TURNOUT: #24 (NEW/UPGRADE) EA 185,000 <br />..... CROSSOVER: #20 (NEW/UPGRADE) EA 345,000 <br />CROSSOVER: #24 (NEW/UPGRADE) EA 378,000 <br />CROSSING SURFACE (NEW/UPGRADE) FT 675 <br />SUBTOTAL - <br />CIVIL / STRUCTURES _ <br />EARTHWORK / STRUCTURES LS <br />MODIFY STRUCTURES LS _ <br />SUBTOTAL ' ' ' <br />SYSTEMS <br />SIGNALING/CTC (NEW/UPGRADE) MI 75,000 <br />CONTROL POINT: 1-SWITCH (NEW/UPGRADE) EA 563,000 <br />CONTROL POINT: 2-SWITCH (NEW/UPGRADE) EA 703,000 <br />----CONTROL POINT: 4-SWITCH (NEW/UPGRADE) EA 849,000 <br />--~ROSsiNG SIGNALS (NEW/UPGRADE) EA 270,000 <br />SUBTOTAL ' ' ' <br />RIGHT-OF-WAY SF 4.00 <br />CONSTRUCTION SUBTOTAL 2,020,000 - <br />ADD-ONS <br />.... i=N~INEERING, PROJ MGMT, ADMIN, START-UP, INSURANCE (20%) 404,000 <br />.... ~;(~NTINGENCY (20%) 404,000 <br /> 2,828,000 - <br />_T_OTAL_(_~199--9 DOLLARS) __ _ <br /> <br />BRW, Inc. D [~ ~ ~ ~ Con-b-01.xls[SEGF] 12/03/98 <br /> <br /> <br />