My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6. SR 12-21-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
12/21/1998
>
4.6. SR 12-21-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:33 AM
Creation date
5/3/2004 8:18:16 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/21/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHSTAR CORRIDOR MAJOR INVESTMENT STUDY <br /> COMMUTER RAIL SYSTEM - SERVICE CONCEPT B <br /> PRELIMINARY CAPITAL COST ESTIMATE (1999 DOLLARS) <br /> SEGMENT D - COON RAPIDS TO ANOKA/RAMSEY APPROX. LENGTH (MI): 9.0 <br /> <br /> COMMUTER RAIL POTENTIAL CAPACITY ADDITIONAL CAPITAL <br /> UNIT BASIC ELEMENTS IMPROVEMENTS IMPROVEMENTS <br />COST ELEMENT UNIT COST <br /> QUANTITY COST QUANTITY COST QUANTITY COST <br />STATION (ANOKA/RAMSEY) <br />-- PLATFORM, SHELTER, LIGHTING, FURNISHINGS, ETC. EA 375,000 2 750,000 ___ <br />TICKET VENDING MACHINE EA 115,000 I 2 230,000 <br />PUBLIC ADDRESS & VMS EA 105,0002 210,000 <br />- ~I~EDEVELOPMENT / INCIDENTALS EA 300,000 1 300,000 <br />SURFACE PARKING SPACE 2,500 1,000 2,500,000 <br />PROPERTY ACQUISITION ACRE 180,000 8 1,440,000 <br />SUBTOTAL 5,430,000 <br />TRACKWORK <br />TRACK: 136# RAIL/CONCRETE TIES (NEW/UPGRADE) MI 623,000 <br />TURNOUT: #20 (NEW/UPGRADE) EA 170,000 <br />TURNOUT: #24 (NEW/UPGRADE) EA 185,000 <br />CROSSOVER: #20 (NEW/UPGRADE) EA 345,000 __ <br />CROSSOVER: #24 (NEW/UPGRADE) EA 378,000 <br />CROSSING SURFACE (NEW/UPGRADE) FT 675 <br />SUBTOTAL <br />CIVIL / STRUCTURES <br />EARTHWORK / STRUCTURES LS <br />MODIFY STRUCTURES LS <br />SUBTOTAL <br />SYSTEMS <br />SIGNALING/CTC (NEW/UPGRADE) MI 75,000 <br />CONTROL POINT: 1-SWITCH (NEW/UPGRADE) EA 563,000 <br />CONTROL POINT: 2-SWITCH (NEW/UPGRADE) EA 703,000 <br />CONTROL POINT: 4-SWITCH (NEW/UPGRADE) EA 849,000 <br />CROSSING SIGNALS (NEW/UPGRADE) EA 270,000 <br />SUBTOTAL <br />RIGHT-OF-WAY SF 4.00 <br />CONSTRUCTION SUBTOTAL 5,430,000 <br />ADD-ONS <br />ENGINEERING, PROJ MGMT, ADMIN, START-UP, INSURANCE (20%) 1,086,000 <br />CONTINGENCY (20%) 1,086,000 <br />T__0_'FAL (19~99_ DOLLARS) 7,602,000 <br /> <br />BRW, Inc, [~ [~ z~ [~ ~ Con-b-01.xls[SEGD] 12/03/98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.