NORTHSTAR CORRIDOR MAJOR INVESTMENT STUDY <br /> COMMUTER RAIL SYSTEM -- SERVICE CONCEPT B <br /> PRELIMINARY CAPITAL COST ESTIMATE (1999 DOLLARS) <br /> COMMON SYSTEM ELEMENTS <br /> COMMUTER RAIL POTENTIAL CAPACITY ADDITIONAL CAPITAL <br /> UNIT BASIC ELEMENTS IMPROVEMENTS IMPROVEMENTS <br /> COST ELEMENT UNITCOST <br /> QUANTITY COST QUANTITY COST QUANTITY COST <br />VEHICLES <br />LOCOMOTIVES EA 2,700,000 5 13,500,000 <br />---'-~OACHES EA 1,300,000 9 11,700,000 <br />.... ~O~'R~OL COACHES EA 1,820,000 5 9,100,000 <br />- E~NGiNEER~NG' ETC. (15%) 5,145,000 _ <br />CONTINGENCY (10%) 3,430,000 <br />- S~U B~rOTA L 42,875,000 <br />CENTRAL FACILITIES <br />TRACKWORK & INCIDENTALS LS 5,000,000 1 5,000,000 <br />CENTRAL SHOP & EQUIPMENT LS 6,000,000 I 6,000,000 <br />OPERATIONS CONTROL CENTER LS 2,100,000 1 2,100,000 <br />PROPERTY ACQUISITION LS 300,000 1 300,000 <br />ENGINEERING, ETC. (20%) 2,680,000 <br />CONTINGENCY (20%) 2,680,000 <br />SUBTOTAL 18,760,000 <br />TERMINAL TRACKWORK & LAY-UP FACILITIES <br />TERMINAL TRACKWORK & LAY-UP FACILITIES EA 4,300,000 2 8,600,000 <br />PROPERTY ACQUISITION LS 60,000 2 120,000 <br />ENGINEERING, ETC. (20%) 1,744,000 <br />---~3oN~I-N G~'Nc~-(20%) 1,744,000 <br />SUBTOTAL 12,208,000 <br />MINNEAPOLIS CBD STATION <br />.... MiNNEAPOLiS CBD STATION LS 7,000,000 1 7,000,000 ___ - <br />ENGINEERING, ETC. (20%) 1,400,000 ___ <br /> CONTINGENCY (20%) 1,400,000 __ <br />--- s~UBTOTAL 9,800,000 <br /> <br />BRW, Inc. ~) [~ ~ [~ c~ Con-b-01.xls[COMMON] 12/03/98 <br /> <br /> <br />