My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-2004 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2000-2009
>
2004
>
04-12-2004 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:32 AM
Creation date
5/3/2004 7:22:37 PM
Metadata
Fields
Template:
City Government
type
CCM
date
4/12/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes Page 4 <br />April 12, 2004 <br /> <br /> decided to get the masonry work completed by the end of the month and to take possible action <br /> against The Saint Paul Companies to recover any city expenses. <br /> <br />Councilmember Dietz asked if The Saint Paul Companies had chosen someone that was higher <br />priced than the amount allowed within the bid. <br /> <br />Mr. Stutesman stated that when the masonry contractor that was on the site went out of <br />business, everything stopped and Kraus-Anderson needed to keep everything going. Kraus- <br />Anderson went out on their own and solicited three bids and then sent those onto the <br />representative of the bonding company. The bonding company did not select one of these firms <br />and hired a different consulting fm-n to get the project completed. There were approximately 12 <br />other projects around the metro area that also were left uncompleted by this contractor, and that <br />is why the bonding company hired this outside f'u'm to complete the projects. <br /> <br />Councilmember Dietz felt that since The Saint Paul Companies is a bonding company it is their <br />obligation to take care of this or to pick up the extra cost. Finance Director LoriJohnson stated <br />that The Saint Paul Company does have the right to choose and our attorney will look at this <br />further. Unfortunately this issue may end up in a lawsuit. <br /> <br />Status of Public Safety. gun range. Mr. Stutesman explained that there was an issue of ventilation <br />at the gun range and how to operate the unit from within the room. He stated that he is <br />expecting to get and have installed the inside unit this week. The range itself was ready by the <br />end of January and the ventilation system should be ready in a week's time. <br /> <br />Explanation of the City. Hall project dumpster bill. Jim Beckwith explained that when the <br />project was bid there were some allowances for dumpsters but to get the best number and the <br />best prices for the dumpsters these were bid as a separate entity pulling them out from all the <br />subcontractors. The dumpster bill amount is a cumulative total. When going to contract they <br />were working off of preliminary budgets and not comparing line items. I~aus-Anderson got the <br />best price for the city by ordering the dumpsters cumulatively versus each subcontractor <br />including it in their bid with everyone having their own dumpster on site. The amount was <br />based on so much for each dumpster. This is not an unreasonable bill. If each individual <br />subcontractor had a dumpster in their bid, the city would have paid more. <br /> <br />Timetable for completion. Mr. Stutesman explained that the overall project was to be <br />completed on May 1 with the Utilities moving into their portion of the building. This date still is <br />the expected timetable. Blacktop is scheduled for May 7 and landscaping and seeding to be <br />completed when sodding takes place. <br /> <br />Councilmember Dietz explained that he felt the punch items need to be completed before the <br />final payment is issued. <br /> <br />Police Chief Jeff Beahen explained that currently the geo-thermal system in the Public Safety <br />building does not appear to be working efficiently ~vith a recent invoice running over $2,000 a <br />month for the gas bill. He felt the problem was that the system is in coolant mode most of the <br />time and the makeup air unit, which is gas f'zred, is small with the heating open and that has to be <br />resolved. <br /> <br />Jim Beckwith stated that it is frustrating for the staff of Kraus-Anderson as well as city staff for <br />these final items to not be handled in a timely manner, and yes, the city does have an avenue by <br />withholding money. Council also has to remember that IQaus-Anderson is the city <br /> <br /> <br />