My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.b. PRSR 08-12-1998
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
1993-2000
>
1998
>
08-12-1998
>
7.b. PRSR 08-12-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2015 12:37:33 PM
Creation date
2/18/2015 12:37:32 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
8/12/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• subdivision would connect the new trailhead and Top of the World Park. The <br /> northerly trail through Top of the World would be paved connecting to <br /> Woodland Trails Park. The northerly trail has less slope and is the better of <br /> the two for pavement, however a portion of the trail is on Shiely property. <br /> The northerly trail will have to be rerouted on park property or purchase the <br /> land the trail is on. <br /> Concept B <br /> This concept locates a trailhead park adjacent to Top of the World Park <br /> within a future subdivision. This concept sites a parking lot, children's play <br /> structure and restroom on a 3-4 acre parcel towards the northeast corner of <br /> Top of the World. As in concept A, a paved trail through the existing park <br /> could connect to Woodland Trails Park. The northerly trail through Top of <br /> the World would be paved connecting to Woodland Trails Park. The <br /> northerly trail has less slope and is the better of the two for pavement, <br /> however a portion of the trail is on Shiely property. The northerly trail will <br /> have to be rerouted on park property or purchase the land the trail is on. <br /> Concept C <br /> This concept assumes no future park dedication and locates a trailhead in the <br /> existing borders of top of the World Park. The northerly trail through Top of <br /> the World would be paved connecting to Woodland Trails Park. The <br /> northerly trail has less slope and is the better of the two for pavement, <br /> however a portion of the trail is on Shiely property. The northerly trail will <br /> have to be rerouted on park property or purchase the land the trail is on. <br /> • <br /> f:\shrdoc\planning\stevewen\parkmmo\topof.doc <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.