Laserfiche WebLink
Lighting <br />Will the outdoor storage area have lighting? If so, what types of light standards will be utilized and where <br />will they be located. <br />Grading <br />Stormwater runoff from this site is subject to the requirements of the MPCA issued City NPDES <br />MS4 permit. This permit prescribes the need for the applicant to provide the following: <br />1) Submittal shows calculations for rate control of stormwater discharge from new impervious <br />surface. Calculations also need to show volume control (no increase in post construction <br />volume) <br />2) Applicant needs to show calculations demonstrating that 1.1" of rainfall over the new <br />impervious area is infiltrated in the new basin. (to achieve pollutant load reduction) <br />3) Applicant needs to submit a long term maintenance plan for the new infiltration basin. <br />(instructions on how and when the infiltration basin will be maintained) <br />Conditions will be suggested that these comments be addressed as part of the final approved documents. <br />Please submit revised drawings and other requested information, as indicated above, by noon on February <br />9th, 2015 for inclusion in the City Council packet for approval on February 17"'. <br />Please let me know if you have any questions. <br />Sincerely, <br />Chris Leeseberg, Park Planner /Planner <br />Ph: 763.635.1033 <br />Fx: 763.635.1090 <br />cleeseberg(a�E&RiverMN.gov <br />