Laserfiche WebLink
. <br /> We core drilled a 4"hole through the outside wall on the back of the gym to pull cables through. <br /> We installed special wall hooks to place our cables above and across the running track. We also <br /> used the school's lift to pull cat.6 cable across the gym ceiling to connect to their network. <br /> By parking our trailer in the back of the school and running cables through this new access we <br /> are minimizing any contact by the public near our equipment. Since the issue at the Elk River <br /> Football game we go to great lengths to minimize running our cables anywhere the public walks. <br /> You can see in the photo on the following page how we ran the cables at the Maple Lake Gym. <br /> ' .� Ats,,, <br /> g r ■0 <br /> i '‘ .'%: - r sir <br /> . - 1 <br /> Delano Gym Trailer Access Trailer Cable Interface Maple Lake HS Gym <br /> Equipment Repairs, Upgrades and Miscellaneous Notes <br /> Buffalo - We finished the first phase of HD upgrades in the Buffalo Council Chambers. We have <br /> also held staff training. We are making some additional changes to their presentation system. <br /> Elk River- We finished the first phase of HD upgrades in the Elk River Council Chambers. We <br /> have also held staff training. We are almost finished with an HD press feed in their council <br /> chambers. We are making some additional changes to their presentation system. <br /> Rockford—We had an issue with audio in the playback rack but otherwise everything is <br /> working well. <br /> Big Lake—Everything is going smoothly in Big Lake. They are in our next group of cities to <br /> upgrade. <br /> Cokato—We had some equipment issues in their playback rack that have been repaired. <br /> 4 <br />