Laserfiche WebLink
Ms. Michele McPherson <br />November 20, 2001 <br />Page Two <br /> <br />Currently, the development only shows one access point, that being in the northeast <br />corner onto CSAH 12. This location will require a permit from Sherburne County and <br />any improvements that Sherburne County deems necessary. The second access point <br />from this residential area will be onto Tyler Street from the property immediately south of <br />Trott Brook Farms South. A preliminary sketch plan of this property showing the access <br />onto Tyler Street has been submitted. The proposed access onto Tyler Street will be <br />immediately opposite the most southerly access to the industrial development on the <br />west side of Tyler Street. <br /> <br />This raises the question of how much of Trott Brook Farms South could be developed <br />with only one access. Current zoning requirements would indicate that the longest cul- <br />de-sac allowable is 700 feet. Perhaps a temporary access onto Tyler Street for <br />emergency access only could be developed either on the Trott Brook Farms South <br />property or somewhere on the property south of this development through the <br />acquisition of a temporary easement. There will need to be ongoing discussions relative <br />to this issue with City staff prior to any development of Trott Brook Farms South. <br /> <br />If this development does not access Tyler Street in the southwest corner adjacent to the <br />access from Elk River Crossing, the left turn lane that was constructed on Tyler Street, <br />anticipating this connection, will need to be removed by these Developers. In addition, <br />there is a driveway for a field access into this property off of CSAH 12 just east of the <br />Black property. This will also need to be removed as part of the development of this <br />property. <br /> <br />Review of the grading plan indicates there are some minor issues relative to the <br />steepness of some of the driveways and other minor issues. We will continue to work <br />with the Developer's engineer to rectify these issues. <br /> <br />The storm drainage calculations have been submitted, reviewed, and revised and <br />submitted again. We are continuing to work with the Developer's engineer on the storm <br />drainage issues. The storm drainage calculations for this development are rather <br />complex because it is part of a much larger drainage area draining property north of <br />CSAH 12 and east of Tyler Street through the same storm sewer system. In order to not <br />exceed the 5.0 CFS maximum discharge from this site, a detailed analysis of the <br />drainage from the site will need to be prepared and analyzed relative to the time of the <br />peak runoff from the site. We are continuing to work with the Developer's engineer on <br />this issue. If an adequate storm drainage system utilizing the Tyler Street drainage <br />system cannot be designed, the ponds within the development will need to get slightly <br />larger to restrict the peak discharge to 5.0 CFS. This may have the effect of reducing <br />the total number of units proposed. <br /> <br />The sanitary sewer system to serve the proposed development consists of an extension <br />from the trunk line in Tyler Street to the southwest corner and laterally sized sewer lines <br />throughout the development. Water service for the proposed development will consist of <br />a connection to a stub constructed by the Elk River Municipal Utilities near the northwest <br /> <br /> Howard R, Green Company <br />Ltr 11-19-01 McPherson[1].rev CONSULTING ENGINEERS <br /> <br /> <br />